01 How did the instructor set the scope of this session?One chapter of Workbook One per question, in strict order. Any question from either workbook, in any order. Questions about Workbook One only, without dividing them chapter by chapter, because the chapters overlap. Case studies only, discussed in full detail.
02 A coach who is also a parent wants to mention what worked with her own children. What does the session allow?Nothing personal may ever be mentioned in a coaching session. Ask permission first, present it as one strategy that may or may not work for that family, and keep it rare. Share it every time it seems relevant, since lived experience builds trust. Share it only after the parents have failed to find a solution themselves.
03 How does this session define countertransference?The parents projecting their feelings onto the coach. A coach who becomes too formal with a family. The coach projecting personal feelings, experiences, expectations, or judgments onto the parents. A disagreement between the coach and the parents about the action plan.
04 Which of these did the instructor treat as a sign of countertransference?Taking notes during the session. Asking the parents what they have already tried. Becoming frustrated that the parents did not finish the action plan, and rushing them. Ending the session on time.
05 When does the instructor ask coaches to activate the observer self?Only after a session that went badly. Before the session begins, and during it, as a reminder of the role, the framework, and the boundaries. Only in supervision, with a colleague present. Once a year, as part of a formal review.
06 A trainee felt the first four chapters contradicted Chapter Five. How did the instructor resolve it?She agreed that Chapter Five replaces the earlier approach. She said the reaction should never be controlled, only the meaning. She said the two complete each other: immediate strategies manage the reaction, and Gestalt work changes the interpretation so the feeling and the reaction change with it. She said the difference is a translation error in the workbook.
07 What does the instructor say a peer practice session between two trainees is for?Explaining the chapters to each other so both understand them. Applying the technique's questions in order, taking turns as coach and volunteer. Assessing each other's readiness to take real clients. Comparing notes on difficult cases from their own caseloads.
08 In APET, the parent says the event has never happened to her before. What does the instructor advise?Keep asking until an earlier memory surfaces. Move to childhood memories, where the pattern will be. Do not insist. Ask what she connected it to, or how she interpreted it, and continue. Stop the technique and choose a different one.
09 A parent answers the emotion question with “My stomach tightened up.” What does the coach do?Record it as the emotion and move on to the thoughts. Explain that emotions are not real physical events. Say that this is something felt in the body, ask what the emotion would be called, and then ask where it was felt. Ask her to describe the physical sensation in more detail.
10 Why does the instructor insist on WDEP after APET?Because APET is only for coaches and WDEP is only for parents. Because awareness without action is incomplete work, and WDEP turns it into evaluation and a plan. Because APET takes too long to complete in one session. Because WDEP replaces the need for any awareness work.
11 How does the instructor relate constructivism and behaviorism in coaching work?Parents start in behaviorism and coaching moves them to constructivism. Constructivism is for adults and behaviorism is for children. Both must be present: understanding the cause and meaning first, then repeating the new behavior until it holds. Only behaviorism matters, because change is visible in behavior.
12 A coach asks a client, “What do you think if we do this or that?” and the client agrees. Whose plan is it?The client's, because she agreed to it freely. Both equally, because it was decided together. The coach's, because the coach proposed the options; agreement is not the same as generating a plan. Nobody's, because a plan only counts once it is written down.