Original source guide
Parental Coaching Basics: Coaching Stages, Action Planning, and the APET/WDEP Reality-Check Technique
This map preserves the supplied summaries’ teaching sequence. The lessons provide a clearer learner explanation, while each note points back to the client-facing or contextual source section.
Source boundaryThe source is spoken-content analysis: no usable visual observations were available. It also marks several passages as unclear or ambiguous. This module preserves those limits rather than turning uncertain wording into instructions. Lesson tables come from the Basics of Coaching slide deck, cited by slide number; its percentages are illustrative, and it expands WDEP as Want, Doing, Evaluate, and Plan where the recording is incomplete.
Lesson 01
The five-stage coaching journey
Understand how parental coaching moves from awareness to independent self-coaching over time.
Open learner explanation →Client-facing learning pathwayThe supplied client-facing summary presents the five stages as the core journey from limited awareness to sustained self-monitoring and intentional action.
Client-facing summary §§1-4 Spoken evidence in the contextual reportThe context report identifies reflection/discovery, preparation, planning and action, measurement and evaluation, and maintenance/self-coaching as the explicit sequence taught in the recording.
Context report §§1, 5-6 Slide deck: stages and strategiesThe Basics of Coaching deck aligns each coaching stage with a change stage and the coach’s role, and names a key strategy for each phase.
Basics of Coaching deck, slides 20-21 Lesson 02
Discovery, preparation, and commitment
Build awareness first, then translate a parent-owned intention into a SMART goal.
Open learner explanation →Original discovery and SMART contentThe contextual report describes exploration of knowledge, attempts, blame, triggers, effects, resistance, responsibility, and SMART goal setting during the first two stages.
Context report §§7-8, 11-13 Client-facing practice framingThe supplied summary explains awareness before advice, parent-owned goal setting, and the four-week yelling example as the practical illustration for SMART planning.
Client-facing summary §§5-6, 8 Slide deck: yelling scenario and SMART goalThe deck introduces a mother who yells at her six-year-old, her realisations in the reflective stage, and her goal written against each SMART criterion.
Basics of Coaching deck, slides 22-23 Lesson 03
Co-create small actions that fit the family
Build a gradual plan with the parent instead of delivering a generic solution.
Open learner explanation →Original collaborative planning contentThe source states that plans should account for family dynamics, parenting style, lifestyle, support, living circumstances, and practical constraints; it warns against giving parents a complete prescribed plan.
Context report §§6, 8, 11-12 Original four-week illustrationThe report documents tracking, interruption strategies, added discipline approaches, evaluation, and maintenance as an illustrative progression, including reported example percentages.
Context report §10; client-facing summary §6 Slide deck: action plan and trackingThe deck gives a five-step action plan with tools and a four-week record of actions, challenges, and adjustments, including illustrative percentage reductions.
Basics of Coaching deck, slides 24-25 Lesson 04
Interrupt reactive patterns with awareness
Use observation, a mindful pause, and clearer communication to create room for a different response.
Open learner explanation →Original tracker, pause, and attention practicesThe source teaches a Yelling Tracker Journal, body-warning signs, a pause or brief room change, visual reminders, and a sequence for gaining a child’s attention before giving an instruction.
Context report §§8-10, 14; client-facing summary §7 Source uncertainty and safety boundaryThe recording includes specific breathing instructions and strong physiological claims but does not provide screening, contraindications, or safety limits. It also gives internally inconsistent age guidance for visual reminders. This study guide retains the behavioural purpose while not presenting those details as medical or age-specific instruction.
Context report §§12, 15 Slide deck: action plan and adjustmentsThe deck lists the five-step action plan with its tools, and the adjustments made after a setback: earlier stress signs, stepping away, and a calm-down signal.
Basics of Coaching deck, slides 24, 32 Lesson 05
Measure, review, and give constructive feedback
Review what happened with care: look at implementation, outcomes, and the next adjustment instead of making a quick judgment.
Open learner explanation →Original measurement and feedback contentThe context report describes weekly records, before-and-after comparisons, parent reports, child responses, coach observation, implementation review, and constructive challenge rather than praise alone.
Context report §§5, 8, 11-13 Client-facing leadership messageThe client-facing summary frames the central shift as regulating the parent’s own reactions, confirming what is happening, and choosing a more constructive response rather than trying primarily to control the child.
Client-facing summary §§8-10 Slide deck: before-and-after comparisonThe deck compares yelling frequency, discipline style, and the parent’s feelings before coaching and after four weeks; its figures differ from its four-week tracker.
Basics of Coaching deck, slide 33 Lesson 06
Maintain progress and self-coach through setbacks
Prepare for difficult moments, learn from setbacks, and help parents continue without relying on constant coach direction.
Open learner explanation →Original maintenance and relapse-prevention contentThe report describes self-monitoring, follow-up, support systems, revisiting goals after a setback, remembering achievements, and continuing self-coaching after formal sessions.
Context report §§5, 8, 11-14 Original trainee-practice instructionThe recording asks trainees to apply APET and WDEP to their own daily triggers and interactions before expecting to use the techniques with parents and families.
Context report §10 Slide deck: maintenance and self-coachingThe deck lists maintenance strategies with examples, the final self-coaching questions, and the stage-five self-coaching tools.
Basics of Coaching deck, slides 26-27, 34 Lesson 07
APET and WDEP reality checks
Use two question-based tools to examine a reaction, test whether it helps, and choose a more intentional next action.
Open learner explanation →Original APET and WDEP practiceThe report defines APET as Activating Event, Pattern Match, Emotion, and Thought, and documents the WDEP questions about wants, current doing, evaluation, and an alternative plan.
Context report §§6-8, 13-14; client-facing summary §5 Original terminology ambiguityThe source reports later APAT wording and an incomplete spoken expansion of WDEP. The practical questioning pattern is clear, but the formal terminology should not be extended beyond the recording.
Context report §§7, 15 Slide deck: APET and WDEP by stageThe deck maps APET and WDEP onto the five stages, walks through an APET example, a WDEP plan, and a setback, and expands WDEP as Want, Doing, Evaluate, and Plan.
Basics of Coaching deck, slides 28-32 Source appendix
Resources and recording limits
Resources mentioned in the session
The recording refers to standard and child-and-family workbooks, updated course folders and videos, WhatsApp announcements, and the books The Whole-Brain Child and No-Drama Discipline. These are references from the session, not additional recommendations or verified links from this site.
What this source cannot confirm
The contextual report identifies unclear French book titles, incomplete or inconsistent terminology in a few passages, and no usable visual observations. Where the recording is unclear, the learner content avoids inventing a precise claim or instruction.