Parental Study · Module 2.1 practice

Read the readiness. Choose the next step.

These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.

Apply the module

'This is how I have always parented'

A parent says their strict approach is fine and that the child is the only reason there is conflict. They want the coach to give the child a better behaviour plan.

What is the strongest coaching response?

Knowledge check

Recall the change logic.

Choose the strongest answer based on the supplied Module 2.1 material.

0/13 answered
01A parent says, “My child is the only problem. I do not need to change.” What is the strongest coaching first step?
02Which pattern best fits contemplation in the session?
03Why does the source recommend asking whether a belief is helpful or unhelpful?
04What does the session say turns a written plan into behaviour change?
05Why does the session combine behaviourism and constructivism?
06Which item belongs to the Intentional Change Theory process taught here?
07Which response most reflects a growth mindset?
08How does the session distinguish a lapse from relapse?
09After a setback, what sequence is most consistent with the source?
10What does the source emphasize about time with children?
11Which emotional stage does the course deck pair with contemplation?
12According to the course deck, what makes change permanent?
13In the Intentional Change Theory diagram, what are “my gaps”?