Teach children how to think, not only what to do
The instructor compares leadership at work with leadership at home and describes parents as their child’s coach. Parent leadership means teaching children how to think, regulate emotions, and generate alternatives, not only issuing commands or telling them which steps to follow.
Discipline is teaching
Discipline is framed as intentionally teaching the child rather than merely forcing compliance or punishing behaviour. Boundaries and household rules teach responsibility and what is permitted or prohibited. The instructor describes appropriate boundaries as an act of love, even when a child dislikes them, held within a safe and loving relationship.
Reframe the direction of the emotion
After an emotion has been understood, the session ends with three reframing shifts that redirect it toward something useful.
- Guilt into learning.
- Anger into problem-solving.
- Worry into trust.
Explain the why, and use shared stories
The instructor encourages coaches to explain the rationale behind strategies rather than handing parents instructions without context. Participants also discussed the Inside Out films as a way to talk with children about emotions, with the second film described as focusing more on emotions and anxiety, and the conversation adapted to the child’s age.
The coach’s role in the course deck
The Behavior Based Coaching deck describes the coach’s job in the same leadership terms: to train parents to lead with confidence, emotional control, and purpose. It sets out four ways coaching does this.
- Explaining how emotions and behaviours are wired in the brain, so parents move away from punishment-based discipline toward coaching-based guidance.
- Offering structured models to help parents guide their children’s emotional growth.
- Using methods such as APET, WDEP, and the Intentional Change Model to reframe behaviours and build effective discipline strategies.
- Training parents to stay calm under pressure and respond to their child’s needs.