Parental Study · Module 4.2 practice

Find the belief. Test the evidence.

These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.

Apply the module

“The teacher ignored me on purpose”

At school pickup, a rushed teacher walks past without greeting a parent. The parent tells the coach, “She never respects me. She always does this to parents like me.”

What is the strongest coaching response?

Knowledge check

Recall the coaching logic.

Choose the strongest answer based on the supplied Module 4.2 material.

0/13 answered
01How does the session describe a limiting belief?
02A parent says, “Everyone in my family always said it, so it must be true.” What does the session warn about?
03Which is a clue the session gives for spotting a fixed belief?
04When a coach hears a fixed statement, what does the session model first?
05A rushed teacher walks past without greeting a parent, and the parent decides the teacher was being disrespectful. Which trap is this?
06“I feel overwhelmed, so I must be a failed mother.” Which trap does this show?
07In the A-to-F technique, what happens at stage D?
08What goes in the fourth column of the Competing Commitment worksheet?
09In what order does the instructor combine the two techniques?
10Which set of actions does the session present as the route from a promised change to a habit?
11Which three ways does the course deck give to lock in a new commitment?
12In the deck’s Lina and Maya scenario, how true did Lina say her big assumption felt, on a scale of 0 to 10?
13“My partner left the kitchen a mess, so I’m a terrible parent and spouse.” Which thinking trap is this in the course deck?