Replay the event with a new response
In chair four the parent revisits the original difficult event, but replaces the negative attractor with the positive one. They rehearse the new sequence step by step.
- Pause.
- Breathe.
- Use a supportive affirmation.
- Approach the child with curiosity or connection.
- Apply the chosen strategy.
Add an anchor
Choose a physical reminder and pair it with an affirmation. The session’s examples are pressing the thumb while saying “I am calm and I am capable,” and placing a hand on the heart while saying “Mistakes are here to help us grow.” The course deck sets out positive memory work as its own sequence that ends in using an anchor. Its example memory is a mother who calmed her child after a tantrum by sitting on the floor and quietly holding space.
| Step | What happens |
|---|---|
| 1. Find a positive memory | Think of a time you handled a tough moment well. |
| 2. Visualize it fully | Recall what you saw, felt, said, and heard. |
| 3. Anchor it | Use a physical cue, such as touching two fingers together, to lock in the feeling. |
| 4. Practise recall | Use the anchor when stressed to activate calm, confident emotions. |
| 5. Apply it in the moment | The more often it is used, the more natural it becomes. |
Practise outside the session
The instructor says practice in the session alone is not enough. The anchor, the affirmation, and the new behaviour need repetition outside coaching so the preferred response can be reinforced. The deck adds follow-up habits: journal wins and setbacks, use the anchor in daily moments rather than only in sessions, and reflect together on patterns while celebrating progress, no matter how small.
The Empty Chair Tool in the deck
The deck presents the empty chair as a Gestalt technique for rewriting inner scripts, bringing an internal struggle outside so it can be understood and changed. In the session, one or two empty chairs can hold an imagined conversation with yourself, your child, a partner, the observer self, or the inner critic.
- Set the scene: start with deep breathing and calming techniques.
- Express negative feelings: speak to the chair as a part of you, such as “You always tell me I’m not good enough!”
- Bring in positive emotion: “But I remember staying calm when my child had a meltdown—and it worked.”
- Anchor the feeling: a hand pressed to the heart, or a phrase such as “I can do this.”
- Practise and reflect: try it in real life, then bring insights and adjustments to the next session.