Parental Study · Module 5.1Lesson 5

Study explanation · Lesson 05 · 19 min

Build trust and set up the four chairs

Prepare the relationship, the room, and the parent’s body before guided visualization begins, including online.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Trust comes first

Guided visualization asks a parent to close their eyes and revisit painful moments, so the instructor treats trust as a precondition. Build the relationship, needs, and goals in the first session, introduce visualization gradually from about the second session onward, and use the fuller Emotional Smartness exercise later, when appropriate. The exercise may take about 20 to 30 minutes. Explain the technique and agree on the event before asking the parent to close their eyes.

Four chairs, four states

Arrange four chairs facing one another or to suit the available space. The instructor suggests putting a label on each chair so the parent can identify the state it represents. The deck’s worked examples use slightly different names for the same four chairs.

The four chairs · Context report §8; Visualization and Gestalt Techniques deck, slides 14-22
ChairSession namePurposeNames used in the deck
1Present or calm chairA calm home base the parent returns to after every recalled eventPresent chair, home base
2Stressed or Negative Emotional Attractor (NEA) chairRevisit the difficult event and identify the trigger and patternStress chair, Fear/Guilt chair
3Positive response, supportive-self, or Positive Emotional Attractor (PEA) chairReconnect with a lived positive memoryPositive Response chair, Supportive Self chair
4Future or transformation chairRehearse the transformed response with an anchorFuture Response chair, Transformed Response chair

Chair one: settle the body

The instructor’s starting procedure is physical and slow. She advises against using music during the exercise; the coach guides with voice alone.

  • Invite the parent to remove their shoes if helpful and place both feet on the floor.
  • Sit with the back supported or upright, hands resting on the thighs.
  • Breathe through the nose.
  • Speak in a low voice that is not monotone, and stay relaxed yourself.
  • Once the parent relaxes, ask them to close their eyes and prepare to enter the agreed situation.

Running it online

The exercise can be delivered online. Ask the parent to prepare four chairs in advance, position a phone or laptop so you can see them move between chairs, and check that the sound is clear and they can hear your guidance before you begin.

Study explanation based on the supplied Module 5.1 contextual report and the course slide decks. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Next · Lesson 6