Parental Study · Module 5.2 practice

Find the need. Balance the selves.

These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.

Apply the module

“Nobody even notices”

A mother tells you she screamed at her children after cooking, cleaning, and helping with homework all evening. “I yelled, so I’m obviously a bad mother. And nobody even noticed what I did.”

What is the strongest coaching direction?

Knowledge check

Recall the coaching logic.

Choose the strongest answer based on the supplied Module 5.2 material.

0/10 answered
01What is the core coaching question of the Emotional Needs Change Model?
02What does the session say about guilt in parenting?
03A toddler stamps their feet and says no, and the parent becomes angry and cannot tolerate the tantrum. Which need does the session link this to?
04After a parent identifies the unmet need in Chair 2, what does the instructor do?
05Who should preferably choose the anchor?
06Why does the instructor avoid running the four-chair exercise in a group?
07How can a coach identify a parent’s primary self?
08What does the session teach about primary and disowned selves?
09Which ego state steps back, pauses, and reasons before responding?
10A parent comes home angry after a conflict at work and shouts at a child over a small misbehaviour. Which defence mechanism is this?