More than one exercise
Before the role-play, the facilitator recaps what empty-chair visualization can be used for.
- Contrasting the real self with the ideal self.
- Staging a dialogue with the primary or disowned parts of the self.
- Imagining a child speaking.
- Visualizing reaching goals, or the best version of oneself.
- Taking an observer perspective to notice blind spots.
- Supporting acceptance, self-compassion, and forgiving parts of oneself.
One method for ES and EN
The facilitator states that Emotional Smartness, taught in Module 5.1, and Emotional Needs, taught in Module 5.2, use the same implementation method, elements, and tool. The method can use up to four chair positions, and she says it can be adapted to a single chair for an imagined dialogue.
Four positions
The role-play uses four named positions, and the volunteer returns to chair one after each stage to reflect.
| Position | What it represents |
|---|---|
| Chair one | The present moment: a neutral place in current space and time, and the position for reflection |
| Chair two | The negative emotional attractor: the trigger or event linked with strong, disturbing emotions |
| Chair three | A positive parenting memory and a more supportive belief |
| Chair four | The original incident replayed with a revised meaning and an anchor |
The deck’s empty-chair steps
The course slide deck describes the Empty Chair Tool, taken from Gestalt therapy, as a way to bring an internal struggle outside so it can be understood and changed: set the scene with breathing, express the negative feelings, bring in a positive memory, anchor the feeling, then practise and reflect. The role-play in this module follows the same arc across four chairs.