Parental Study · Module 5.3 practice
Test the meaning. Leave the choice.
These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.
Apply the module
“Tell me he was wrong”
After a four-chair session, a mother says, “You heard what my husband said. Just tell me he was wrong, and that he needs to change.”
What is the strongest coaching response?
Knowledge check
Recall the coaching logic.
Choose the strongest answer based on the supplied Module 5.3 material.