Parental Study · Part A.1 practice

Ask what the behavior needs.

These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.

Apply the module

The meltdown at the family lunch

At a crowded, noisy family lunch, a five-year-old starts screaming and lies on the floor. Relatives say she is spoiled. Later, her mother asks the coach what she should have done.

What is the strongest coaching direction?

Knowledge check

Recall the coaching logic.

Choose the strongest answer based on the supplied Part A.1 material.

0/12 answered
01A parent calls their five-year-old “stubborn.” What does the session ask the coach to do first?
02Which three needs does the instructor ask coaches to consider behind a behavior?
03According to the learning perspective, why might a younger child start screaming when angry?
04What does the dynamic-systems perspective add to the other five?
05How did the instructor say milestone lists should be used?
06For children in their first three years, what did the session recommend instead of forcing sharing?
07A participant describes a mother who still cannot feel love for one of her children. What did the instructor advise?
08Parents ask whether to buy the water bottle their child's friends have. What is the strongest coaching response?
09Which of these belongs to preparing expecting parents, according to the session?
10In the course deck, what are the three stages of development before birth?
11The deck's example of a four-year-old who wets the bed again after a new sibling arrives illustrates which perspective?
12On the deck's connected-domains slide, a tired child who acts out shows which connection?