Parental Study · Part A.2Lesson 5

Study explanation · Lesson 05 · 18 min

Emotions, regulation, and tantrums

Give children permission and words for feelings, practise regulation together, and stay present through a tantrum before offering direction.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Permission and words

Children need permission and language to feel and express joy, anger, fear, shame, pride, tiredness, hunger, and excitement. Name feelings again and again, using words, pictograms, or preferably real photographs and social stories, and ask how a character or puppet feels. The instructor warns against telling a frightened three-year-old boy that he cannot be afraid because he is a man.

Calm yourself first

Adults must regulate themselves if they want children to learn regulation. Practise calming strategies together instead of only instructing the child: breathing, counting, dancing, singing, or other movement. A glitter bottle, made from an empty bottle filled with water and glitter, gives an upset child something to watch while they calm.

During a tantrum

The session describes a typical tantrum as screaming or throwing objects without self-harm, lasting roughly one to fifteen minutes. During the episode, stay facing the child and observing them.

  • Don't lecture, shout, threaten, forcibly remove, or isolate the child, because the instructor says they cannot process it then.
  • Let the child know you are there.
  • Offer a hug as the child begins to calm.
  • Afterwards, name the possible need and offer choices.

Connect, then direct

Questions about emotions, and any direction, wait until the child is calm. The order is presence, then connection, then direction. The instructor says she will explain when a tantrum needs special attention, but the recording gives no clear criteria, and the age at which tantrums begin is inaudible.

Repair after conflict

When parents shout, speak harshly, or argue in front of the child, they apologize and reconnect. The instructor adds that a child should not go to sleep believing their parents' love depends on how they behaved that day.

The deck's regulation tools

The course deck describes regulation as beginning with co-regulation and moving toward self-regulation, and reframes meltdowns as overwhelmed regulation rather than misbehavior. It suggests offering simple choices during upset, such as apples or bananas instead of candy, and lists practical tools.

  • Stop, Breathe, Think, to pause before reacting.
  • “I feel” statements, such as “I feel upset when…”
  • Mind jars or glitter bottles.
  • Emotion check-in charts using pictures or emojis.
  • Movement and music.
  • Repair after conflict.

Study explanation based on the supplied Part A.2 contextual report and the Part A slide deck. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Next · Lesson 6