Parental Study · Part A.2 practice

Model it first. Practise it together.

These activities are based on the supplied learning material. They support study and reflection, and do not replace clinical assessment, safeguarding procedures, emergency support, or qualified professional advice.

Apply the module

The homework rescue

Every evening, a mother finishes her ten-year-old's homework when he gets stuck, because she can't bear to see him fail. Now he forgets assignments and expects her to fix them.

What should the coach help her try?

Knowledge check

Recall the coaching logic.

Choose the strongest answer based on the supplied Part A.2 material.

0/12 answered
01What is the instructor's central principle before trying to change a child's behavior?
02Sorting a supermarket list into vegetables, fruit, dairy, and cleaning products is an example of which memory strategy?
03A child asks why trees are green. Which response follows the session?
04According to the instructor, what must come before a child can express themselves verbally?
05How does the session distinguish IQ from emotional intelligence?
06A child says, “I'm bad at math.” Which reframe follows the session?
07How should a learner treat the instructor's statement that 25% of intelligence is inherited through the X chromosome?
08During a tantrum, what does the session recommend?
09In the instructor's metaphor, what is the table and what is the LEGO?
10In the course deck, what does the Must Do, Should Do, Could Do method teach?
11Which calming tool does the deck describe as a way to pause before reacting?
12According to the deck's attachment table, what is the parent-coach tip for disorganized attachment?