Not simply bad behavior
A child's aggression is not necessarily bad behavior. The instructor says it often appears when a child feels in competition with a sibling or friend, wants something they cannot have, is overstimulated, stressed, afraid, or intensely frustrated without a way to express it, has an unmet need, or is being bullied, mocked, or pressured.
Reactive and proactive
Reactive aggression is an immediate response: defiance, shouting, screaming, hitting whatever is nearby, or throwing themselves on the floor. Proactive aggression looks different: copying what others do, bullying, becoming very bossy, or threatening friends so they do what the child wants.
Look for the trigger first
The instructor reminds coaches that children often communicate with their bodies, through hitting or biting, when they cannot say it in words. With the parents, examine all the factors before responding.
- Is the child tired or sleepy?
- Hungry, thirsty, or too warm?
- Overstimulated?
- Afraid, angry, upset, or distressed?
- Competing with someone, wanting something they cannot have, or being bullied?
Instead of yelling: words and outlets
Yelling at the child straight away does not help, and neither does doing the same thing back: humiliating them, using hurtful words, or hitting them. Instead, use emotional labeling to teach the child language for what they feel. Then offer alternatives, such as hitting a cushion, doing jumping jacks, or going for a run, with the adult running alongside. Part of the instructor's explanation just before these alternatives is unclear in the recording.
When to involve a child psychologist
Watch the intensity and the duration. If aggression increases significantly and continues for a long period, the instructor says the family should see a child psychologist about it. She gives no specific thresholds.
What the deck adds
The deck calls aggression a signal, not simply bad behavior, rooted in emotional overload, unmet needs, or environmental stress. It describes reactive aggression as lashing out when afraid or frustrated, and proactive aggression as bullying to gain control or status. Its coaching approach adds clear limits, restorative conversations, and co-regulation tools such as deep breathing and stress balls, and asks coaches to guide parents toward professional support without blame when patterns persist.
Media and violent games: deck only
A further slide says repeated exposure to violent content can normalize aggression and blunt empathy. It suggests monitoring content and the child's reactions, not just ratings, and dialing back if a child becomes anxious or aggressive; co-viewing or co-playing with reflection questions such as “Was that a good choice? What else could work?”; and balanced tech boundaries, such as time limits and no-violence zones on school nights. The session did not discuss media or games, so this is the deck's material alone.