Parental Study · Part A.3Lesson 7

Study explanation · Lesson 07 · 14 min

Friendship from three to eighteen

What friendship looks like at three to five, six to twelve, and thirteen to eighteen, with the scripts parents can teach at each stage.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Three to five: side by side

Young children play in parallel: next to each other, imitating each other, without sharing anything. Teach them to ask “Can I play with you?”, and introduce turn-taking with “My turn, your turn.”

Six to twelve: best friends

Friendship becomes close: “She is my friend, I do not want to be apart from her.” Friends do everything together and share interests. If a friend moves to another gymnastics group, a child may want to move too. This is the time to teach the I statement, emotional labeling, and a wider feelings vocabulary, as in “I was upset when you did not notice that it was my turn.”

Apologies that mean something

Use role-play to teach apologies that name the action and what will change: “I am very sorry that I took this ball without asking you. Next time, I will ask you first.” It is not simply about saying sorry. The instructor does not force children under six to apologize, because she says they do not yet understand what an apology means or why they are making it.

Thirteen to eighteen: secrets and advice

Teenagers share secrets, news, music, and plans for who they want to become, and ask friends for advice, even on what to wear. Coach parents to listen without judging: “Tell me what happened. I am here to understand you. I am here to listen and see how I can help you.”

A safety cue for peer pressure

Map out responses to peer pressure in advance. One script lets the teenager use the parent as the reason: “If the plan feels wrong, blame me: my mom will check.” The instructor calls this a safety cue that helps the child protect themselves and set boundaries.

The deck's friendship table

The course deck sets out the same three stages in a table, with a skill or script for each.

Friendship by age · Part A deck, slide 66
Age rangeWhat friendship looks likeCoach-led skills and scripts
3 to 5 yearsParallel and associative play: children play side by side and copy each other.Teach “Can I play?” Practise turn-taking with a timer: “My turn until the bell rings, then yours.”
6 to 12 yearsCooperative play and best friends: loyalty, fairness, and shared hobbies matter.Introduce “I feel” statements: “I felt left out when you skipped my turn.” Role-play quick, sincere apologies: “I'm sorry I grabbed the ball. Next time I'll ask.”
13 to 18 yearsDeep emotional bonds: friends share secrets, values, and future dreams, and peer approval skyrockets.Coach parents on listening without judging: “Tell me what happened, I'm here to understand.” Map out responses to peer pressure: “If the plan feels wrong, blame me: my mom will check.”

Read with careThe deck adds associative play at 3 to 5 years; the session describes parallel play in which children do not share, and teaches turns rather than sharing. The deck's scripts are shorter versions of the session's.

Study explanation based on the supplied Part A.3 contextual report on morality, self-control, prosocial behavior, aggression, and peer relationships, and on slides 54-68 of the Part A slide deck. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Next · Lesson 8