Parental Study · Part B.1Lesson 5

Study explanation · Lesson 05 · 14 min

Family mapping, behavior reframing, and role experimentation

Three tools from the session, and a fourth from the deck, help a coach place a behavior in its family context before anyone decides what to change.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Family mapping

Family mapping is one way to understand the family dynamic. The coach draws out the family and looks at each person's role and the responsibilities they carry at home, each person's pattern and style, their parenting approach, and how they deal and interact with the child.

Major events of the past year

A family map also records major events, for example from about a year ago until now, and asks how much the environment, and each family member's behavior, has been affected by them.

  • Moving house.
  • Changing schools.
  • Moving to another country.
  • The death of someone close who used to spend a lot of time with the family.
  • Displacement, especially during war, when families may be forced from their homes.

Behavior reframing

Instead of asking “What is the problem with this behavior?”, the instructor asks coaches to explore why it is happening.

  • What could be causing it?
  • Why is it being repeated?
  • Why was it not there before, and what happened?
  • How do the child's behavior and the parent's response feed each other?

Role experimentation

The instructor says role experimentation works particularly well. When both parents attend a session, they can switch roles, each playing the other, to appreciate the other's load: the effort, time, energy, pressure, and exhaustion involved. A father may know his wife works yet find it hard to recognize how much it takes, and the same can apply to the mother. Parents can also be placed in the child's position: they imagine being treated the way they treat the child, and ask themselves how the child might feel.

A scope reminder

In this part of the session, the instructor adds that a coach who has not studied family coaching cannot work directly with children. The qualification and scope behind that statement are not defined further, so read it as a reminder to work within your training.

The deck's four tools

The deck lists four simple tools for understanding family dynamics. Its wording differs from the session's in places, so the table sets them side by side.

Simple coaching tools for family dynamics · Part B deck, slide 6
ToolThe deck's descriptionHow the session uses it
Family mappingMake a simple family tree to see patterns and rolesDraw out the family: roles, responsibilities, patterns, parenting approaches, interactions with the child, and major events
Timeline reflectionLook at big events, like moves or losses, and notice how family behavior changedNot named as a separate tool; major events of about the past year are part of family mapping
Behavior reframingInstead of “What's wrong with this behavior?”, ask “What message is it sending about the family?”Ask why it started, what causes it, why it repeats, what changed, and how child and parent responses feed each other
Role experimentationGently change who does what in the family to reduce stress and help everyone growParents swap roles in a session to appreciate each other's load, or imagine themselves in the child's position

Read with careThe deck and the session use the same names for different things in places. Timeline reflection is a separate tool only in the deck, and the deck's role experimentation changes real household roles, while the session's is a role-play exercise.

Study explanation based on the supplied Part B.1 contextual report on family systems and parenting styles and the Part B slide deck, slides 2-12. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Next · Lesson 6