From the child to the family
Part A of this workbook was about the child: development, behavior, thinking, emotions, and a growing sense of self. This session opens Part B, the part about the family. The question widens from what a child is going through to what is happening around the child: the parents, the home, and the way everyone in it affects everyone else.
More than people under one roof
A family, the instructor says, is more than people living together under one roof. It is a system, a unit that cannot be separated, and even if the family does separate, its parts stay connected. If something happens with the mother, the father and the children are affected. If something happens with the father, the mother and the children are affected. If something happens with a child, both parents are affected. Everyone has a role, whether they are three months old, thirty, or sixty, so no one's place in the family is unimportant.
The family triad
The instructor describes drawing a family triad, although the drawing itself is not part of the source. The coaching program works on three core elements together: the parents, the child, and the family as one system. The mother and father founded the family through a decision, a commitment, and a responsibility, which she says is something she always wants to remind parents of. The child is the one who made the family take shape and become real.
An ongoing cycle
The instructor rejects a one-way picture. Everything works together at once, in what she calls an ongoing cycle.
- Parents to child: the parents' emotional well-being, parenting style, and communication shape the child's behavior, self-esteem, identity, and development, because the child watches and copies.
- Child to parents: the child's needs, challenges, illnesses, crises, and developmental phases affect the parents' stress, their responses, and the decisions they make.
- The home: routines, the way problems are solved, and the family's values and principles influence everyone, and are influenced in turn.
Through the mother's shadow
Even when a coach works only with the mother, she has her husband and children behind her. She is influenced by them and influences them. So, in the instructor's words, through the mother's shadow the coach is also working with her children and her husband. This is why she works on the parents' leadership at all: if the parents change, the child's behavior and relationship with them change, and then the atmosphere at home changes too. The report adds a caution. This describes indirect reach, not a reason to treat every family member as a coaching client.
What the deck adds
The Part B deck calls families emotional ecosystems and names the idea Family Systems Theory, which sees the family as a living, connected unit. When one part changes, the rest adapt, whether they realize it or not, and if one person is stressed, sad, or acting out, the rest of the family often feels it too. The session teaches the same idea without naming the theory.