Parental Study · Part B.1Lesson 8

Study explanation · Lesson 08 · 16 min

Resistance, safety, and the limits of coaching

Three questions from the group, about a father who yells, a parent who says his child never makes mistakes, and uninvolved parents seen at school, test where coaching can help and where it cannot.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

A father who yells

A participant describes a father who becomes very aggressive at home whenever work goes badly: he yells, swears, and speaks badly to the mother. The mother worries that her daughter will learn that this is a normal way to speak to someone. The father has never come to coaching, and the coach cannot speak with him. The instructor's answer is to put together a safety plan, and to teach it to both the mother and the child.

The safety plan she describes

Her concrete example is short.

  • When the father starts yelling and shouting, the child goes to their room and does not interact with him.
  • The mother explains that when Dad is upset he yells, that this is not the most appropriate way, and that Dad is not able to regulate himself very well.
  • She can contrast this with what she teaches the child to do instead, such as taking a breath.
  • So when Dad becomes angry, they move away from him and sit in the room.

When there is violence

This plan is for yelling. When the discussion turns to physical violence, such as a father hitting the mother or the children, the recording becomes unclear, and the instructor's remark about protection is not explained. She describes referral in her own context as leading to little action unless something very serious happens, when a social worker may work with the family at home, without naming a jurisdiction. She also warns that in cases of abuse, a father who finds out may become even more violent, and that a mother may excuse his behavior to protect herself, which she calls natural. None of this is a safeguarding procedure. Where there is violence or a risk of harm, the session points to referral, and the pathway and reporting duties depend on where you practise. The Part B deck returns to maltreatment, red flags, and reporting in slides 25-36.

“My daughter never makes mistakes”

Another participant describes a father who insisted his daughter never makes mistakes and was not willing to listen. The instructor first asks what such a father would come to coaching for. Someone who believes his child is never wrong would not come in the first place, and someone completely unwilling to listen is not coachable. She describes two extremes: parents who always believe their child is at fault while everyone else is right, and parents who say their children never make mistakes. She calls the father's position a form of resistance, a defense mechanism he has built for himself.

If a resistant parent is referred

If such a parent does come, for example through a referral, the instructor would be non-directive. One phrase in her suggested opening is inaudible in the recording.

  • Ask open-ended questions that do not point fingers, such as “Tell me what happened.”
  • Avoid implying that one person is right and the other is wrong.
  • Build trust first, for example: “I am here in this session not to blame anyone. There is no such thing as right or wrong in this session. You are the ones who determine what is right and what is wrong.”

When your power to change things is limited

A teacher in the group describes seeing uninvolved parents, and possibly verbal abuse, and wishing someone had the legal authority to intervene. The instructor answers that, in her experience, there is often no one, and at most a social worker is involved. She describes this as her own experience, without naming a jurisdiction. Her advice is to accept this reality, which she says is not resignation, and to do what remains within reach: stay close to the child, help them personally, and stand by them.

Managing countertransference

Coaches and teachers will feel upset in these situations, especially because many are parents themselves. The instructor says this is something to address in your coaching and to control within yourself, so that you do not engage in countertransference: your own emotional reaction to a family or child, which has to be recognized and managed in the work. Some things are beyond a coach's reach, and the scope for change can be very limited.

Study explanation based on the supplied Part B.1 contextual report on family systems and parenting styles and the Part B slide deck, slides 2-12. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Go to practice