Favoritism parents do not notice
Favoritism can happen without the parents realizing it, so the instructor tells coaches to listen to how parents speak. They often talk far more about one child: the disruptive one, the one whose temperament does not resemble theirs, or the one who needs a different approach that exhausts them. Then they describe the other child as wonderful and perfect.
Labels children take on
Children notice how they are spoken to and spoken about. A child may take on the label and conclude, “As long as I keep being difficult, my mother gives me attention.” Parents may also prefer the calm child who does not upset them, often the one who resembles them. Yet a child who resembles a parent can also be the hardest to handle, because the parent sees themselves in that child. The instructor says there is no general rule.
Comparison harms self-esteem
“Be like your brother. Study like your sister. Your sister excelled.” The instructor says comparison and favoritism harm not only a child's self-confidence but their self-esteem, their sense of worth. The child concludes, “I am not worthy. No matter how much effort I make, my mother does not see me,” and learns to keep trying to please. Comparing a child with other people's children does the same harm, leaving a feeling of not deserving the family's love.
Siblings as one team
One helpful practice is to make the siblings a team against the parents. In competitive games, such as board games, the siblings play together and the parents play together. The instructor warns never to pair the mother and one child against the father and another child. The aim is to plant the idea that the siblings are on the same side and can work together to beat the parents.
When jealousy turns toward a parent
A participant described a teenage girl who damaged her mother's makeup and cut her hair extensions, while telling her mother, “You are thinner than me, and your hair is long while mine is short.” The mother let it continue because she did not want to upset her daughter. The instructor was clear that harm is not acceptable and not normal, and that the mother was not being the parent or the leader. The work, she said, is with the mother, not the girl. Some details, including the girl's age, are unclear in the recording.
- Do not let the damage continue; the mother sets the limit.
- Sit down with the girl, ask what is upsetting her, and look at the situation from her point of view.
- Consider the father too, since the jealousy may involve both parents.
- At this age there is strong identification with parents, so the mother can spend time with her daughter, take her out, and take care of herself alongside her. A father can do the same with a son.
What the deck adds
The deck warns against favoritism and labels, such as “You're the smart one” or “He's the troublemaker,” which can harm self-esteem and sibling relationships. To build teamwork, it suggests shared responsibilities such as tidying up together, and friendly competitions such as games or cooking challenges to channel rivalry positively. The deck does not say who competes against whom; the session's version puts the siblings on one team.