Why an apology followed by the same harm teaches a child that they are the problem, and why repair means changing what the adult does.
Listen to this lesson
Hear the lesson read aloud, with each sentence highlighted as you go.
Narrated by an AI voice.
The Maria cycle
The instructor describes a parent who hits Maria, yells at her, and mocks her: “Oh, you're crying? Let me give you something to cry about.” When the parent calms down, they apologize and tell Maria they love her. The next day, the parent becomes angry, yells, hits her, and quickly apologizes again.
What Maria learns
Maria concludes: “I am the problem. I must be doing something for my mother to become angry like this.” The parent is placing the responsibility on the child, as if saying “Because of you, I behave this way,” instead of taking ownership of their own actions as the adult. Part of the explanation of what repeated apologies mean to the child is unclear in the recording.
Sorry needs change
For the instructor, “sorry” has no meaning if the adult does not correct their behavior. She put this strongly: she said she would rather a parent did not apologize at all than apologize and then repeat the same harm, and she asked coaches to work on this with parents. For the same reason, she says a child should not be taught to say sorry without also learning how to correct the mistake.
A point to read with care
Her strong wording is about change. The course deck pairs replacing spanking with boundary-setting and repair conversations, and Part A.2 teaches parents to apologize and reconnect after conflict. The report's own summary of the best practice is to take ownership of adult behavior and pair any apology with a real correction of the harmful pattern.
Coach the parent in front of you
Coaches often hear, “How can I get the father to change?” The instructor's answer is to focus on the parent you are working with. If only the mother is the client, work with the mother. She can then talk with the father in a way that helps him understand and explore the issue, and together they can practise the skills with the child. If both parents take part, look at how each one interacts with the child. Expecting to change a father who is not in the coaching by working only with the mother does not work, in her view.
Study explanation based on the supplied Part B.3 contextual report on child maltreatment, red flags, and safer parenting responses, and slides 25-36 of the Part B slide deck. Open the source notes above for report-level and slide-level traceability.
Your study checkpoint
Ready to continue?
Mark the lesson complete after reading, reflecting, and testing the central idea.