Still happening
The instructor opened the final Family session by saying that domestic violence and the physical punishment of children are still very common. Many parents raise their children the way they themselves were raised, so hitting often follows the culture of the parents' own childhood. Some parents tell a coach openly that they hit their children, often because they need help finding another way, while other parents do not admit to hitting at all.
Education is not awareness
It is tempting to assume that educated, cultured parents do not hit. The instructor rejects this. She says education and parenting awareness are not related: highly educated parents may hit their children every day, while some parents with little education never lay a hand on them. A coach should not use a parent's education or profession to judge what happens at home.
Authority, ego, and triggers
Many parents hit because they are afraid of losing their authority. They experience the child as disrespecting, provoking, or challenging them, and the thought becomes: “Who are you to challenge me? I am stronger.” The instructor describes this as an adult using greater physical strength against a smaller person who cannot stop them, which feeds the parent's pride and ego even if they feel guilty afterwards. A trigger can also lead parents to behave with their children the way their own parents behaved with them, and some take the child's behavior very personally, put themselves on the child's level, and end up hitting.
Out of other options
Another reason is that parents feel they have no other way left to deal with the child. This is where coaching begins: looking together at what is working and what is not, and remembering that whatever a parent uses, the child is learning from it for the future.
Questions instead of condemnation
The instructor asks coaches not to say “You cannot hit your child,” and not to show shock on their face, because the parent will become defensive, justify themselves, and resist. Instead, ask questions that let the parent reach the conclusion themselves, such as realizing that the child is not learning anything useful, only becoming afraid. A short passage right after these questions is unclear in the recording.
- “What did you try before hitting?”
- “Is the hitting actually helping?”
- “What is your child learning from you when you hit, and what would they learn if you were gentle?”
What the deck adds
The course deck opens this topic by saying that the parent and child bond shapes trust, emotional regulation, and a child's sense of safety, and that coaches must both recognize risks and equip parents with safer tools for discipline and connection. It also says that most harmful behavior comes from stress, lack of skills, or learned patterns rather than an intention to injure, which is why coaches can step in by teaching alternatives.