Two kinds of consequences
Logical consequences are set by the caregiver and directly related to the behavior. If a bicycle is left in the corridor, where people walk and someone could trip, it cannot be ridden that week. Natural consequences happen on their own: someone forgets their jacket, feels cold, and remembers it next time. Both teach decision-making, responsibility, and cause and effect. The deck's version places the bike in the driveway, with bike privileges paused for safety.
The consequences chart
The instructor encourages coaches to help families make a consequences chart alongside the rules chart, especially with older children, so the child knows in advance what happens if a rule is broken. The deck gives three examples, and the instructor walks through the same three. For a missed curfew, she adds a second option: the child does not go out at all next time.
| Rule | If broken… | Consequence |
|---|---|---|
| Homework first | Not done | No video games that evening |
| Curfew 10 PM | Missed | Earlier curfew next time |
| Be respectful | Hurtful words | Apologize & make it right |
Read with careThese are examples. The instructor stresses that each family sets its own rules and consequences, and that a coach does not dictate them.
The family decides
Natural consequences are not a universal rule. A participant described warning their son about turning the air conditioning up high while sweaty, then letting him do it. The boy was ill for three or four days and now uses it carefully. The participant acknowledged it was a significant risk and that hospital was possible. When another participant said she could not let her children get sick, the instructor answered that each parent decides when to allow a natural consequence and when not to. There is no fixed rule, and the anecdote is not a procedure to copy.
When punishment is needed
The instructor says that in certain situations punishment is useful: when a child keeps breaking rules that are already in place, and whenever safety is involved. A participant described a non-negotiable night routine for their thirteen-year-old son: after homework, a shower. If he refuses, something that matters to him, such as the PlayStation, is taken away. The instructor agreed, but added that children should not be punished for just anything, and that what matters most is that the child knows the rule. Her safety examples include not sending a child in the car with a parent who drives very fast, a very clear punishment when siblings hit each other, and taking the car keys after a teenager drives too fast. Handing the keys back after a second offense is the parent's mistake.
Positive and negative punishment
The instructor uses two terms. Negative punishment removes something the child values, such as car keys or screen time. Positive punishment adds something, such as extra chores or an extra hour of study. Either way, punishment is calm and causes no harm: no threats, no hurtful words that stay in the child's mind, and no hitting.
Related, proportionate, and known
A consequence fits the child's age and the action. Cleaning up after the dog for two weeks is not a consequence for coming home late, because it has nothing to do with the behavior; coming home earlier next time is. Consequences should be agreed and known in advance, not decided suddenly. The exception the instructor gives is safety: a child who runs in front of a car goes straight inside and loses outdoor play, even if that consequence was never discussed.
The deck's conditions for punishment
The deck says logical and natural consequences work most of the time, but punishment may be appropriate under these conditions. One difference to note: the deck lists rules explained beforehand as a condition, while the instructor treats an immediate safety risk as a reason for an on-the-spot consequence.
- Safety is at risk, such as dangerous driving or violence.
- Rules were clearly explained beforehand.
- Consistency is applied, with no empty threats.
- Respect is maintained: punishment is calm, not shaming.
- Proportionality is kept: the consequence fits the behavior. A teen caught driving recklessly loses car privileges for a week, not indefinitely.