Parental Study · Part C.2Lesson 3

Study explanation · Lesson 03 · 14 min

Name it to tame it, and tap in, tap out

Name the feeling, find it in the body, breathe into it, and let a partner take over when one parent has reached their limit.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Name it to tame it

The instructor's second tool is name it to tame it. When I say “I am angry,” the feeling stops growing, because I have given it a name, and it no longer has the power to control my behavior. Saying it also makes me notice where I feel it and whether I am starting to react, for example wanting to go and sit alone when I am sad. Naming puts a frame around the feeling, which she calls regulation step by step.

Where do you feel it?

Naming leads to early awareness. The instructor links it to mindfulness exercises that help a parent ask: where do I feel this in my body? She teaches the same method to children, with the parents taking part. She names a situation, draws something on paper, and asks: “What are you feeling? You are feeling sad. Where do you feel sadness in your body?” The child puts a hand wherever the sadness is, perhaps on the heart or at the throat. What she draws, and one body area she names, are unclear in the recording.

Hand on it, and breathe

Once you find where the feeling sits, place your hand there and simply breathe. The instructor says the feeling does not go away, but it becomes less intense. She presents this as a first step that parents and children can practise together.

All feelings are accepted

Naming feelings also teaches the child that it is okay to have big feelings. In the instructor's words, all feelings are accepted and no emotion is wrong. She warns coaches that some cultures discourage certain feelings, fear in particular and especially for boys, because it is seen as vulnerable. She describes fear as the primary emotion and anger as the one that shows most often: the more fear is hidden, the more anger there may be. Several phrases in this part are unclear.

Tap in and tap out

Parents also need a support system. A parent can tell their partner that they need support and are becoming very angry, and together they agree on tap in and tap out. When the child is very challenging and the mother cannot manage, the father taps in and she steps out. When the father reaches his limit, the mother taps in and he steps back. The instructor says this also shows the child that the parents are a team: one has handed the lead to the other and taken a step back.

What the deck adds

The deck's name it to tame it example is saying out loud, “I'm feeling frustrated right now.” It helps parents acknowledge a feeling without acting on it, and shows children that big feelings are okay and can be managed. Under early awareness, the deck lists warning signs such as tight shoulders, a fast heartbeat, or a sense of dread, so parents can pause before stress spills onto the child. The session teaches awareness through the body instead and does not list these signs. The deck's support system is also wider: a partner, family, friends, or a support group, with tap in and tap out as the technique to try with a partner.

Study explanation based on the supplied Part C.2 contextual report and the Part C slide deck, slides 15-24. Open the source notes above for report-level and slide-level traceability.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading, reflecting, and testing the central idea.

Next · Lesson 4