Document assessments and their purposes
List only the assessment tools actually used and explain why each was selected. The trainer gives Level of Life, Johari Window, and Child Temperament as possible examples, not as mandatory tools. The report should connect assessment information to the coaching need, leadership skills requiring development, and other support areas.
- Name each assessment actually used.
- Explain why it was used with this parent or family.
- State what need or development area it helped identify.
- Do not describe administration or scoring that the recording does not teach.
- Keep the term “Level of Life” unchanged; its method and scoring are not explained.
Move from development areas to goals
After reviewing assessment information, identify the areas in which parents need support or leadership-skill development. Then define the goals to be addressed. The sequence should be visible to the reviewer: assessment information, identified need, goal, and initial action steps.
- Identify specific development areas supported by the coaching information.
- Set goals that respond to those areas.
- Record the initial steps agreed with the parents.
- Show how the plan is intended to support movement from Point A to Point B.
Explain techniques, rationale, and responses
Naming a technique is not enough. State why it was selected, what it was intended to achieve, and how the parents responded. The trainer mentions the A2F Change Model as a possible response to fixed beliefs, reframing, directive and non-directive approaches, and the Emotional Intelligence Model. These are examples to document when actually used, not requirements for every family.
- Name the technique or approach used.
- Explain the reason for selecting it.
- Identify the intended outcome or what was to be reframed.
- Record the parents’ reaction and response.
- Note when one technique appeared to suit the parents better than another, if this was actually observed.
Keep two action categories separate
The trainer distinguishes parents’ work on themselves from strategies they apply with children. Parent-focused actions may include pausing before entering the home when overwhelmed, stepping away briefly when tired, returning later, or identifying emotional triggers connected to anger. Child-focused strategies may include routines, schedules, repeated rules, consistency, activities, or the Turtle Story from the Positive Solution Workbook.
- Parent-focused actions develop or regulate the parents themselves.
- Child-focused strategies are applied by parents with their children.
- Write both categories step by step.
- Do not merge the two categories into one vague action list.
- One child-facing example immediately before the instructions on consistency, rules, routines, and schedules is unclear in the source and must not be treated as a defined technique.