When this report is required
The trainer introduces the final practical report as the next stage after a trainee passes the theoretical assessment with at least 70%. The practical work then provides the evidence for this report: three sessions with each of six volunteer families. This is the process described in this recording; check the Academy’s current instructions for the applicable assessment requirements.
One document, six coaching records
The Academy-created format contains Coaching Number One through Coaching Number Six. Each numbered record corresponds to one parent or family volunteer. The trainee conducts three sessions with each volunteer to support movement from Point A to Point B. A record is not intended to be finalized after the first session because the required information is accumulated across all three sessions.
- Work with six parent or family volunteers.
- Conduct three sessions with each volunteer.
- Complete the relevant record after gathering information across all three sessions.
- Keep all six records in the same document.
- Submit the complete document once, not after each session or volunteer.
Header, participant, and session information
Enter the trainee name as it should appear on the graduation certificate and enter the applicable program name. The recording uses both “Parent Training Program” and “Master Parental and Child Behavior Program,” so the precise official naming should be checked against the supplied Academy format rather than invented. For each volunteer, identify whether the work involved both parents, the mother alone, or the father alone. Record when each of the three sessions occurred and how long each lasted.
- The later clarification supersedes the earlier direction about volunteer names: including a coachee name is optional.
- The volunteer email is required for the Academy’s feedback mechanism.
- For each of the three sessions, record when it occurred and its duration.
- Do not invent or reconstruct fields that cannot be confirmed from the spoken evidence.
Confidentiality and feedback boundaries
Volunteers should be told that their information is confidential. The trainer states that the Academy requires the email address to send its feedback mechanism and does not use that information for another purpose. The trainee coach must not send or distribute the Academy evaluation; the Academy sends it because the Academy conducts the evaluation.
- Explain confidentiality before information is submitted.
- Clarify the stated limited purpose of the required email address.
- Do not send the Academy feedback mechanism yourself.
- Do not treat a volunteer’s optional name as a substitute for the required email.
Language and quality standard
The report may be completed in Arabic, English, or French. The trainer places greater importance on the content than on the language. Every section should be complete, accurate, clear, transparent, understandable, and structured for a reviewer who did not attend the sessions.
- Write for an unfamiliar reviewer.
- Do not assume the reviewer already knows the client or what happened in the sessions.
- Explain rather than merely label important decisions.
- Expect missing, unclear, or unexplained content to be returned for revision.