Specific and measurable
Specific identifies the parent’s observable action. Measurable means deciding what to track. In the sweets example, the trainer approves tracking the frequency and timing of offers, the child’s reactions, and occasions when the parent gives in.
- Specify what the parent will do and when.
- Track frequency and timing rather than relying on a general impression.
- Record relevant child reactions as context, not as proof that the plan has failed.
- Record lapses in parental consistency so they can be discussed without hiding them.
- Use the record to decide what needs attention at follow-up.
Achievable means manageable steps
The trainer warns against moving abruptly from unrestricted sweets to a severe limit. Her preferred approach is to begin with a structure that is realistic relative to the current routine, explain it in advance, and reduce offering gradually.
- Begin in the home environment, which the parent can more directly organize in this example.
- Communicate the new rule before implementation.
- Structure when sweets are offered instead of allowing unplanned access.
- Control purchasing and storage as parental actions.
- Introduce change gradually and expect some resistance or upset.
- The schedules and foods mentioned in the recording are illustrations, not nutritional prescriptions or universal targets.
Relevant or realistic
The trainer uses “relevant” and “realistic” interchangeably or together. In practice, she asks why the goal matters to the parent. The answer becomes a reminder when implementation is difficult.
- Ask, “Why does this goal matter to you?”
- Connect the answer to the parent’s own reasons for continuing.
- Do not treat the reason as a guarantee that the child will cooperate.
- The exact intended expansion of the letter R remains ambiguous in the recording.
Time-bound review
Two weeks is used as an example of a period for applying a routine and reviewing progress. The trainer rejects making complete disappearance of the behavior the deadline.
- Choose a defined review period.
- Review what the parent implemented and what happened.
- Look for gradual progress and obstacles.
- Revise the next steps when the original plan was too abrupt or difficult.
- Do not convert the two-week example into a guaranteed outcome or universal schedule.
Illustrative sweets plan
A parent-focused plan can combine the components without promising a particular dietary or behavioral result.
- Specific: The parent will establish defined times for offering sweets at home.
- Measurable: The parent will record offers, timing, reactions, and occasions of giving in.
- Achievable: The parent will announce the rule and introduce the structure gradually.
- Relevant/realistic: The parent will state why reducing conflict and creating a manageable routine matters to them.
- Time-bound: The parent and coach will review the record after an agreed period.