Parent-Focused SMART Goals in CoachingLesson 3

Study explanation · Lesson 03 · 8 min

Organise and Practise the Course Techniques

The trainer asked learners to create their own techniques reference table, practise only the material they had reached, and bring their work back for correction and guidance. Peer work was for rehearsal rather than teaching or correcting one another.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Create a techniques reference table

For every technique already studied, learners were asked to complete a table independently before receiving correction and guidance.

  • Technique name
  • What the technique is
  • Purpose or objective
  • Expected outcome for the parent
  • When to use it
  • Complete entries only as far as you have studied; not reaching a later technique is not a problem.

The technique map named in the session

The trainer mapped the techniques by chapter. Most were only named or briefly reviewed, so their procedures should not be reconstructed from this recording.

  • Chapter 1: Reality Check, referred to through APT and WDP/WDAP.
  • Chapter 2: Johari Window and ICT, named as Intentional Change Model Theory.
  • Chapter 3: no technique was listed.
  • Chapter 4: A to F Model and Four Column Exercise.
  • Chapter 5: ES, named as Emotional Smartness Change Model, and EN, named as Emotional Needs, the Change Model.
  • SMART goal setting was introduced separately as an additional technique.

Different purposes of the two workbooks

The trainer described the first workbook as the parent-coaching foundation for changes in parent perspective and behaviour. The second workbook was described as containing strategies and tools to implement with children, including structure and routine.

  • Do not treat every child-focused strategy as a parent behavioural-change technique.
  • Connect material across chapters rather than studying every topic in isolation.
  • Use only the procedures that have actually been taught at the learner's current stage.

Practise without becoming the instructor

Learners could rehearse techniques with peers even when they were at different chapters. The trainer restricted peer explanation and correction because earlier peer teaching had produced conflicting accounts.

  • Use peer time to practise a technique.
  • Do not present your interpretation as authoritative course teaching.
  • Bring chapter questions and disagreements to the learning session.
  • Attempt case-study questions even if you cannot yet answer all of them.
  • Treat the mentioned folders, access arrangements, and meeting schedules as historical session administration rather than current availability.

Program-specific role boundary

Within this course, the trainer said Level 1 alone did not prepare learners to conduct a joint session with a parent and child; that preparation was placed in Level 2. This records the trainer's course boundary and does not establish a universal credential, legal rule, or current professional policy.

  • Do not work beyond the preparation described for your course stage.
  • Do not infer the unclear professional-role term used in the recording.
  • Seek clarification within the applicable training or professional setting rather than treating this recording as a current policy document.

Based on part 11.mp4. Open the source guide for the recording’s evidence and limits.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading and reflecting on the central idea.

Go to practice