Four Column Exercise for Limiting BeliefsLesson 2

Study explanation · Lesson 02 · 10 min

Surface Assumptions and Move Toward Action

Once the competing commitment is clear, the coach asks what might happen if the desired behaviour were adopted. Fears and assumptions are expressed as complete statements, questioned through the previously taught A-to-F model, and then connected to SMART goals, an action plan, and later tracking.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Ask what might happen if change succeeds

After identifying the competing commitment, invite the parent to imagine adopting the desired behaviour. This hypothetical question can reveal feared outcomes that make the old pattern feel necessary.

  • Ask: “Suppose you were able to speak calmly without yelling. What might happen?”
  • Possible fears in the example included losing control, being ignored, appearing weak, being judged, and not being a good enough parent.
  • Possible assumptions included “If I stay calm, they will not listen,” “Calmness means weakness,” and “If I do not stop this immediately, they will become disrespectful.”
  • Keep proposed fears and motives tentative until the client recognizes or revises them.

Form complete belief statements

The trainer does not accept isolated words such as “attention,” “ego,” or “leadership” as finished assumptions. The coach helps the client express the predicted relationship between an action and an outcome.

  • Incomplete label: “attention.”
  • Complete statement: “When I yell, I get their attention.”
  • Incomplete label: “weakness.”
  • Complete statement: “If I stay calm, my children may think I am weak.”
  • The recording discusses fear and assumption somewhat unevenly; they are related, but examples sometimes move between the categories.

Question rather than declare

Once an assumption is identified, the trainer moves to the A-to-F Change Model to dispute it and consider a more effective belief and feeling. The coach uses questions so the client can examine how true the belief is rather than simply being told it is false.

  • Examine the emotional consequence of the assumption.
  • Look for situational explanations and contrary evidence.
  • In the example, lack of response might relate to calling from another room, interrupting a highly engaging activity with an unappealing request, or a pattern of repeating instructions.
  • The recording does not define the individual A-to-F letters or provide its complete internal procedure, so those steps should not be reconstructed here.
  • The trainer contrasts fear-based compliance with trust-based respect and argues that stopping yelling and hitting can support trust.

Return to goals and plan action

After belief work, the trainer returns to the desired goals, writes each using the SMART technique, derives step-by-step actions, and reviews progress in a later session before moving to another goal.

  • Do not stop after merely listing limiting beliefs.
  • Choose a revised goal to work on.
  • Formulate it using the SMART goal technique.
  • Develop the action plan step by step.
  • Track progress in a later session.
  • The SMART acronym is named but not expanded in this recording.

Choose the technique according to purpose

The demonstrated order is Four Columns, A-to-F, SMART planning, action, and later tracking. However, the trainer later clarifies that this is not mandatory for every case. A-to-F may be used without the Four Column Exercise, while Four Columns may be useful when a known goal or previous action plan is repeatedly not followed.

  • Consider Four Columns when the client clearly wants a goal but repeatedly acts against it.
  • It may be used in an early session or after an agreed action plan was not implemented.
  • It may also explore an opposite-looking pattern, such as difficulty setting rules because of guilt.
  • Do not interpret difficulty following through as proof of unwillingness, a diagnosis, or a fixed client label.
  • The trainer says coaching supplies techniques and strategies while implementation belongs to the client. The trainer also mentions therapy when something appears outside coaching, but gives no validated threshold or specific referral criteria.

Based on part 15.mp4. Open the source guide for the recording’s evidence and limits.

Your study checkpoint

Ready to continue?

Mark the lesson complete after reading and reflecting on the central idea.

Next · Lesson 3