01 According to the companion analysis, what is the assignment mainly testing?Whether the right AI models and software architecture have been chosen. Whether the implementation schedule is realistic. Whether the structure makes responsibility, authority, coordination and reporting understandable. Whether the whole bank’s organization chart is complete.
02 Why do the three departments not get three separate hierarchies in the chart?They are the departments receiving the change, so one shared project-management layer serves all three. The brief limits the chart to one department. The deck says matrix organizations never show departments. Each department already has its own AI project.
03 What is the ambiguity the analysis identifies in the brief?It names three departments but four sponsors. It asks for a matrix but describes a functional organization. It sets a word range that the chart cannot meet. It asks for three levels, but its example chains four positions.
04 In this chart, what travels along a solid line?Only advice, with no authority. Delegated work from a manager to a direct project report, with progress and issues returning along the same route. Only escalations of unresolved risk. Functional line management for staffing and development.
05 How does the submission’s dotted line differ from the deck’s?It shows dual reporting, while the deck uses dotted lines for direct reporting. It is used only for escalating unresolved risk concerns, while the deck describes dotted lines as advisory or functional oversight. It is identical to the deck’s meaning. It links the functional managers to the sponsor.
06 In this design, who keeps responsibility for staffing, professional development and departmental standards?The project manager. The steering committee. The specialist leads. The existing functional managers.
07 Why does the analysis reject a projectized structure for this project?It could duplicate specialist resources and weaken continuity with the bank’s permanent teams. It gives the project manager too little authority. It keeps every team inside its own department. The deck says projectized structures cannot be used in banks.
08 What does the Week 5 deck say about a strong matrix?It defines a strong matrix as one where the sponsor holds all resources. It recommends a strong matrix for every AI project. It names weak, balanced and strong matrices only in its notes, without defining them. It does not mention matrix variants at all.
09 Which decision belongs with the sponsor and steering committee in this design?Choosing how to retrain a model after a failed test. Scheduling the next training session for call-centre staff. Assigning an analyst to document review findings. Approving a material scope change that exceeds delegated project authority.
10 Why do the business analysts report to the project manager rather than to the technical lead?Because analysts build and train the AI models. So that shared business outcomes, not technical preferences, set departmental priorities. Because the deck requires analysts to report to the project manager. So that the analysts can approve funding.
11 Why does the change management lead sit in the management band?Because the change lead approves the budget. Because the deck says change leads must outrank technical leads. So that training, communication and adoption are planned alongside technical delivery, not after it. So that the change lead can supervise the data scientists.
12 Before rollout, which set of evidence does the submission require?Technical testing, business acceptance, staff readiness and risk review. A signed contract, a budget and a launch date. Sponsor approval alone. A completed training calendar.
13 What does the analysis say the slides do not provide?Any definition of a project sponsor. A Gulf banking regulation, an AI governance standard or a country-specific approval process. Any guidance on organigram lines. Any discussion of matrix structures.
14 Which deck idea supports a dedicated core team with agreed departmental contributions?Maslow’s hierarchy of needs. The definition of a portfolio manager. The flat organigram type. The distinction between dedicated and part-time teams, and the rule that core members need enough time and authority.