Week 5: The Project Team

This map preserves the deck’s teaching sequence while the lessons provide a clearer, learner-facing explanation. Use it to trace every study topic back to the supplied source.

How to use this page

The source is the Week 5 course deck by Dr. Daoud Kiomjian, American University of Beirut. Open a lesson source note for its original teaching focus and slide range. Slide numbers are PDF page numbers, because the deck’s speaker notes run onto extra pages. The deck itself is not republished here, and its diagrams are redrawn rather than copied; distribute the original PDF only when you hold the necessary rights.

Study-guide syntheses

Three elements connect the deck’s ideas rather than quoting it: the “three roles side by side” comparison in Lesson 1, the illustrative project organigram in Lesson 6, and the Week 5 summary. Each is labelled and adds no new facts. Open the Week 5 summary

Lesson 01

Integrated teams and their roles

An integrated team represents every essential function, with members who can decide and have time to contribute. Around it sit four distinct roles: the project manager, the sponsor, the functional manager, and the program and portfolio managers.

Open learner explanation
What an integrated team is

Three characteristics of core members, with building and software examples and the phone-call test for authority.

Source slides 3-5
Types of integrated project teams

People do projects; success depends on definition and team integration.

Source slides 6-7
Role of the project manager

Assigned at initiation, develops the charter, coordinates, integrates, controls variances, and is not necessarily in charge of resources.

Source slides 8-11
Role of the sponsor

Funds, champions, guides, and protects the project; may be shared; the product owner is similar in agile.

Source slides 12-13
Role of the functional manager

Manages departmental resources and expertise, and coordinates with the project manager.

Source slides 14-16
The Head of Global Plastics

A quick check whose answer is the project sponsor.

Source slide 17
Program and portfolio managers

Programs group related projects; portfolios are governed at executive level.

Source slides 18-19

Lesson 02

Different types of project teams

Team structure shapes how effectively work gets done. The deck describes four common types, dedicated, part-time, partnership, and virtual, each with its own advantages and challenges.

Open learner explanation
Types of project teams

Four types, with a diagram, and the choice depending on size, complexity, and resources.

Source slides 21-23
Dedicated

Full-time and exclusive; easiest for the project manager; important on agile projects.

Source slides 24-25
Part-time

Shared time; functional and matrix organizations; design work.

Source slides 26-27
Partnership

Members from several organizations; cost savings; hard to manage.

Source slides 28-29
Virtual

Driven by geographic distance; avoided where possible in agile organizations.

Source slides 30-31
Some notes on virtual teams

Distance, schedules, language, and culture; access to expertise; virtual colocation.

Source slides 32-33

Lesson 03

Managing across generations

Up to five generations now share the workplace, with different values, expectations, and digital fluency. The deck focuses on Gen Z and on how leaders can bridge the gaps without falling back on stereotypes.

Open learner explanation
Multi-generational workforce

Four to five generations with different values, expectations, and digital fluency.

Source slides 35-36
Who is Generation Z?

Born about 1997-2012; digital natives; value authenticity, diversity, and mental health.

Source slides 37-38
Communication preference by generation

From email and calls to texts and DMs; tailor style and foster two-way feedback.

Source slides 39-40
Values across generations

Loyalty, autonomy, purpose, and transparency; avoid a one-size-fits-all approach.

Source slides 41-42
Gen Z and technology at work

Modern tech as a baseline, with structure and mentorship still needed.

Source slides 43-44
Managing Gen Z effectively

Coaching-oriented leadership, frequent feedback, and growth over perks.

Source slides 45-46
Bridging the generational gap

Mentoring both ways, respect and inclusion, and no stereotypes.

Source slides 47-48
Challenges and misunderstandings

Assumptions, tech and tone friction, and manager blind spots.

Source slides 49-50
Video: final takeaway for leaders

Flexibility, feedback, inclusion, and multigenerational leadership development.

Source slides 51-52

Lesson 04

Different management theories

Four classic theories explain what motivates people at work: McGregor’s Theory X and Theory Y, Maslow’s hierarchy of needs, McClelland’s theory of needs, and Herzberg’s two-factor theory.

Open learner explanation
McGregor’s Theory X and Theory Y

Two faces and two sets of assumptions about workers.

Source slides 54-55
Maslow’s hierarchy of needs

A five-level pyramid ending in self-actualization.

Source slide 56
McClelland’s theory of needs

Achievement, affiliation, and power, each managed differently.

Source slide 57
Herzberg’s two-factor theory

Hygiene factors versus motivating agents.

Source slides 58-59

Lesson 05

Organizational structure

Organizational structure shapes communication, decision-making, and authority. The deck compares three models, functional, projectized, and matrix, and shows how each changes the project manager’s power.

Open learner explanation
Why organizational structure matters

Communication, decisions, authority, and alignment with project type.

Source slides 61-62
Functional structure

Departments by function; a minimal or part-time project manager; advantages and silos.

Source slides 63-66
Projectized structure

Built around projects; full project manager authority; advantages and downsides.

Source slides 67-70
Matrix structure

Dual reporting, weak to strong variants, benefits and challenges.

Source slides 71-77
Video: choosing the right structure

No single best model; structures evolve as organizations scale.

Source slides 78-79

Lesson 06

Organigrams

An organigram is a visual map of roles, responsibilities, and reporting lines. The deck explains why organigrams matter, their types and elements, and how to create, read, and use one on a project.

Open learner explanation
Video: what is an organigram

A visual map of structure used for onboarding, planning, and communication.

Source slides 81-82
Why are organigrams important

Clarity, communication, planning, succession, and conflict prevention.

Source slides 83-84
Types of organigrams

Hierarchical, matrix, and flat.

Source slides 85-86
Elements of an organigram

Boxes, solid and dotted lines, levels, and colour coding.

Source slides 87-88
How to create an organigram

Scope, roles and lines, layout, tools, and validation.

Source slides 89-90
How to read an organigram

Top down, dual and dotted lines, bottlenecks.

Source slides 91-92
Organigrams and project teams

Roles, workstreams, accountability, and the project plan.

Source slides 93-94

Source appendix

Where the deck needs a careful reading

Read with care

The product manager line

Slide 18 and its notes both say “the product manager provides oversight to meet both and program goals.” A word appears to be missing. The lesson quotes the line and does not guess its meaning.

Who is in charge of the resources?

Slide 10 says the project manager is in charge of the project “but not necessarily the resources,” and its notes say they are not responsible for the resources, while the same slide has the project manager building and developing the team. Lesson 5 shows why this depends on the organizational structure.

Where part-time teams are common

Slide 26 says part-time teams are common during the design and planning phases of projects; its notes say they are seen on design projects. The lesson shows both.

Virtual teams and agile

Slide 30 says agile organizations usually try to avoid virtual teams and that technology helps; the notes say virtual teams are not recommended for agile organizations. The lesson shows both strengths of statement.

Projectized downsides

Slide 67 lists “professional development opportunities” as a downside of the projectized structure; its notes say reduced professional development. The lesson follows the notes.

Weak, balanced, and strong matrices

Only the notes on slide 72 name these variants, without defining them. The lesson names them and adds no definitions.

Two different lists of three

Organizational structures are functional, projectized, and matrix (slides 63-77); organigram types are hierarchical, matrix, and flat (slides 85-86). They classify different things, so the lessons keep them apart.

Generational traits and stereotypes

Lesson 3 lists traits for each generation (slides 35-46), then warns against generational stereotypes (slides 47-50). The lesson presents the traits as tendencies the deck reports and keeps the warning beside them.

McGregor’s two framings

The notes on slide 55 say McGregor believed all workers fit into one of two groups; slide 54 frames X and Y as what managers assume. The lesson shows both.

Self-actualization in Herzberg

Herzberg’s diagram on slide 58 lists self-actualization, Maslow’s term from slide 56, among the motivating agents. The lesson reports the diagram as drawn.

Illustrative wording

Stray slide numbers in the text layer are ignored, and typing slips such as “neds” and “wont” are corrected without changing meaning. The generation birth years are the deck’s approximations.

Checked against the source slides cited in each note.

What not to take away

The lessons actively work against these misreadings of the material:

  • Anyone from the right department can represent a function, whatever their authority.
  • The project manager always controls the resources.
  • The sponsor’s only job is to pay.
  • The functional manager and the project manager do the same job.
  • A virtual team is simply a dedicated team on video calls.
  • Partnership teams are easy to manage because they save cost.
  • Every member of a generation behaves the same way.
  • A tool such as ChatGPT can replace mentorship.
  • A pay rise is the surest way to motivate a team.
  • Everyone is motivated by the same need.
  • There is one best organizational structure.
  • A matrix works without clear roles and escalation.
  • Organigram types and organizational structures are the same list.
  • An organigram can be shared before the manager validates it.

Study-guide synthesis; each item is addressed in the lessons.