AI-Assisted Coding · Module 3 · Reading
Further reading
The course's own curated list for this module, with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.
This caveat is the Study Library’s, not the readings PDF’s: Web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.
Core readings
Read these after the lecture. The list calls them the minimum supporting readings and estimates about 50 to 70 minutes in total if you stay with the sections it names. Each one backs a specific part of the hands-on work.
GitHub Docs - Best practices for using GitHub Copilot (opens in a new tab)
The main mindset reading for the module. It backs the same loop the lecture teaches: ask, inspect, run, test and refine.
Read this part Concentrate on writing thoughtful prompts, breaking a complex task into smaller ones, giving examples, checking Copilot’s work, and using tests and tooling to validate what it suggests.
GitHub Docs - Asking GitHub Copilot questions in your IDE (opens in a new tab)
Backs Part 3.1: open the real Task Tracker repo, ask questions from inside the editor, and confirm the assistant is reading the right code.
Read this part Skim the parts on chatting in the IDE, smart actions and adding context. Notice the workflows that ask about selected code or a specific file rather than vague questions about the whole repo.
VS Code Docs - Inline chat (opens in a new tab)
Backs Parts 3.3 and 3.4: run inline chat on one selected handler, modal section, render function or refactor target instead of asking for a rewrite of the whole file.
Read this part Read the editor inline chat section, especially selecting a block of code to scope the prompt, and reviewing the inline diff with Keep or Undo.
MDN - HTML Drag and Drop API (opens in a new tab)
Backs Part 3.2: the Kanban board uses the browser’s own drag-and-drop, not a library.
Read this part Focus on the concepts and the basic steps: the draggable item, the data it carries, the drop target, and the dragstart, dragover and drop events. Skip the file-upload examples.
MDN - Using the Fetch API (opens in a new tab)
Backs fetchTasks, renderBoard, the POST and PATCH form submissions, and the board’s error state.
Read this part Focus on sending JSON, reading JSON responses and checking the response status. The list singles out one detail as the most important for Module 3: fetch does not reject just because the server answers 404 or 422, so your code has to check the status or ok itself.
GitHub Docs - Writing tests with GitHub Copilot (opens in a new tab)
Backs Part 3.5: let Copilot help brainstorm and draft tests, then verify the tests yourself.
Read this part Read the introduction and the Copilot Chat testing workflow. Notice how specific the test requirements need to be, and that verification comes after generation.
Practical references
Keep these open while you build and debug the Kanban board, check generated code, diagnose browser and API problems, or write tests. The list is clear that they are lookup references, not sit-and-read assignments.
FastAPI - Testing (opens in a new tab)
Use while adding backend tests for PATCH edge cases and status-transition behavior.
Read this part Focus on TestClient, naming test functions with test_, and using the client the way you would use httpx. Skip advanced deployment or async topics Module 3 does not use.
pytest - Documentation (opens in a new tab)
The reference for running pytest, reading its failures, and writing small, readable test functions.
Read this part Use it for lookup. For Module 3 you mainly need the naming conventions, how to run selected tests, and how to read failure output. The list warns against drifting into fixtures, plugins or large test architecture unless your instructor assigns it later.
MDN - DataTransfer (opens in a new tab)
Use while checking the dragstart and drop code that stores the task id with dataTransfer and sets the move behavior. The list notes it is more specific than the drag-and-drop overview and helps when Copilot generates confusing dataTransfer logic.
Read this part Focus on setData and getData, effectAllowed and dropEffect. Skip the clipboard and file-transfer sections.
VS Code Docs - Manage context for AI (opens in a new tab)
Use when Copilot answers from generic patterns instead of the actual Task Tracker files.
Read this part Focus on adding files, folders, symbols, terminal output and codebase context to chat, so your prompts are grounded in the files you are actually editing.
Optional deeper dives
Use these only after the core work is done, and selectively. The list says they go beyond what Module 3 needs and are not required for the quiz, the deliverables or grading.
GitHub Docs - Prompt engineering for GitHub Copilot Chat (opens in a new tab)
Extra practice writing prompts that carry context, constraints, examples and output expectations.
Read this part Read selectively. The Module 3 prompts already model the pattern; this is for learners who want broader Copilot prompting guidance.
Martin Fowler - Exploring Generative AI (opens in a new tab)
Broader practitioner context on AI-assisted software delivery, for after you finish the module. The list keeps it optional on purpose: Module 3 is a hands-on module, not a software engineering theory module.
Read this part Read selectively. Pick posts about human oversight, AI-assisted delivery practice or code review; do not treat the whole series as assigned reading.
Where each one helps
Readings, mapped to the lessons.
| Reading | Supports |
|---|---|
| Core 1 · Best practices for using GitHub Copilot | The ask, inspect, run, test, refine loop across every lesson |
| Core 2 · Asking GitHub Copilot questions in your IDE | Lesson 2, setting up and verifying the assistant (Part 3.1) |
| Core 3 · VS Code inline chat | Lessons 4 and 5, selected edits on the modal and the refactor (Parts 3.3 and 3.4) |
| Core 4 · MDN HTML Drag and Drop API | Lesson 3, native drag-and-drop on the board (Part 3.2) |
| Core 5 · MDN Using the Fetch API | Lessons 3 and 4, fetchTasks, POST/PATCH and checking response status |
| Core 6 · Writing tests with GitHub Copilot | Lesson 6, brainstorming and drafting tests (Part 3.5) |
| Practical 1 · FastAPI Testing | Lesson 6, TestClient tests for PATCH edge cases |
| Practical 2 · pytest documentation | Lesson 6, running selected tests and reading failures |
| Practical 3 · MDN DataTransfer | Lesson 3, the task id carried by dragstart and read on drop |
| Practical 4 · VS Code manage context for AI | Lessons 2 and 7, grounding answers in the real repo files |
| Optional 1 · Prompt engineering for Copilot Chat | Prompt library practice after the core work |
| Optional 2 · Exploring Generative AI | Wider context on human oversight, after the module |