AI-Assisted Coding · Course resources
Every resource in the course
One guide to the course’s references: 57 curated readings from 4 module reading lists, 101 prompts from 5 prompt libraries, and the two projects with their worked examples. Each reading keeps the course’s own note on what it is for and which part to read.
Every outbound link was taken from the supplied reading lists’ own link annotations; none was added, substituted or assessed here. Web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes. Links open in a new tab.
Module 01 · Reading list
Module 1 · Mindset, Foundations & Prompt Engineering
Core readings
Read these after the lecture. The list calls them the minimum supporting readings and estimates about 45 to 60 minutes in total if you focus only on the sections it names. They directly support the Module 1 material.
OpenAI — Prompt engineering (opens in a new tab)
The ChatGPT and OpenAI-side reference for writing clear instructions and improving a model’s output through the way you design the prompt.
Read this part Read the introductory guidance and the general prompting strategies. Skip the API implementation details you don’t need for browser-based course work.
Anthropic — Prompt engineering overview and prompting best practices (opens in a new tab)
The Claude-side reference for the same ideas the module teaches: clarity, examples, roles, constraints and structured outputs.
Read this part Read the overview and the best-practice sections on clear instructions, examples and few-shot prompting, role prompting and output structure. Skip the advanced agentic-system sections for now.
GitHub Docs — Responsible use of GitHub Copilot Chat (opens in a new tab)
Reinforces the professional habit at the center of Module 1: AI output is a draft that you review, test and correct.
Read this part Focus on the sections about limitations, reviewing output, testing generated code, and using AI as a tool rather than a replacement for human programming.
Atlassian — User Stories with Examples and a Template (opens in a new tab)
Supports hands-on Part A, where you generate and review Task Tracker user stories with acceptance criteria.
Read this part Focus on the standard “As a [user], I want [goal] so that [reason]” format, the 3 Cs, and why acceptance criteria make a story testable.
Martin Fowler — Architecture Decision Record (opens in a new tab)
Supports hands-on Part B, where you write a short architecture decision record in your own words.
Read this part Focus on what an ADR is, why it should be short, and how it records a decision, its context and its consequences. Skip the repository-management details unless they help.
Practical references
Use these while you complete the Task Tracker requirements and diagnose scaffold issues. The list calls them lookup references you keep open while you work, not assigned “sit and read” essays.
Claude Projects and ChatGPT Custom Instructions (opens in a new tab)
Companion: OpenAI — ChatGPT Custom Instructions (opens in a new tab)
For thinking about project context and persistent setup, especially after the lesson on stateless conversations.
Read this part For Claude, read the Projects page; for ChatGPT, the Custom Instructions help page. Treat both as helpers, never as substitutes for a task-specific context block.
Anthropic — Interactive Prompt Engineering Tutorial (opens in a new tab)
Extra practice turning weak prompts into structured ones.
Read this part Prioritize the chapters on prompt structure, being clear and direct, assigning roles, examples and few-shot prompting, and formatting output.
Optional deeper dives
Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings and the practical references, if you want more detail.
Cognitect / Michael Nygard — Documenting Architecture Decisions (opens in a new tab)
The original lightweight ADR framing that many later ADR templates build on.
Read this part Focus on the idea of documenting architecturally significant decisions and their consequences.
AWS — Prompt engineering concepts for Amazon Bedrock (opens in a new tab)
Only if you also work with Bedrock or cloud-based Claude and API workflows.
Read this part Focus on the general prompt-quality ideas; skip the Bedrock setup and cloud configuration.
Google — Gemini prompt design strategies (opens in a new tab)
If you want to compare Gemini with ChatGPT or Claude after the First Contact exercise.
Read this part Focus on iterative prompting, clear instructions, context and examples.
Martin Fowler / Thoughtworks — Exploring Generative AI (opens in a new tab)
Practitioner reflections on AI-assisted software delivery and team workflows.
Read this part Read selectively: choose the posts about code review, human oversight or AI-assisted delivery practice.
Anthropic Engineering — Effective context engineering for AI agents (opens in a new tab)
An advanced extension, from context blocks toward agentic workflows.
Read this part Focus on the idea that the model’s useful output depends on what context is available to it. Skip the agent orchestration details for Module 1.
Research papers on LLMs for requirements and user stories (opens in a new tab)
Companion: Exploring the Use of LLMs for Requirements Specification (opens in a new tab)
Companion: Automated User Story Generation with Test Case Specification Using LLM (opens in a new tab)
For instructors and advanced students who want the evidence behind AI-assisted requirements drafting.
Read this part The suggested order: “Can LLMs Generate User Stories and Assess Their Quality?”, then “Exploring the Use of LLMs for Requirements Specification,” then “Automated User Story Generation with Test Case Specification Using LLM.”
OpenAI Cookbook — GPT-4.1 prompting guide (opens in a new tab)
Only once you are comfortable with the core prompt anatomy and want a model-specific coding prompt reference.
Read this part Focus on the concrete prompt examples and the model-specific instruction style. Don’t treat it as the Module 1 standard: the course is tool-agnostic.
Module 03 · Reading list
Module 3 · Frontend, Testing & Debugging with AI
Core readings
Read these after the lecture. The list calls them the minimum supporting readings and estimates about 50 to 70 minutes in total if you stay with the sections it names. Each one backs a specific part of the hands-on work.
GitHub Docs - Best practices for using GitHub Copilot (opens in a new tab)
The main mindset reading for the module. It backs the same loop the lecture teaches: ask, inspect, run, test and refine.
Read this part Concentrate on writing thoughtful prompts, breaking a complex task into smaller ones, giving examples, checking Copilot’s work, and using tests and tooling to validate what it suggests.
GitHub Docs - Asking GitHub Copilot questions in your IDE (opens in a new tab)
Backs Part 3.1: open the real Task Tracker repo, ask questions from inside the editor, and confirm the assistant is reading the right code.
Read this part Skim the parts on chatting in the IDE, smart actions and adding context. Notice the workflows that ask about selected code or a specific file rather than vague questions about the whole repo.
VS Code Docs - Inline chat (opens in a new tab)
Backs Parts 3.3 and 3.4: run inline chat on one selected handler, modal section, render function or refactor target instead of asking for a rewrite of the whole file.
Read this part Read the editor inline chat section, especially selecting a block of code to scope the prompt, and reviewing the inline diff with Keep or Undo.
MDN - HTML Drag and Drop API (opens in a new tab)
Backs Part 3.2: the Kanban board uses the browser’s own drag-and-drop, not a library.
Read this part Focus on the concepts and the basic steps: the draggable item, the data it carries, the drop target, and the dragstart, dragover and drop events. Skip the file-upload examples.
MDN - Using the Fetch API (opens in a new tab)
Backs fetchTasks, renderBoard, the POST and PATCH form submissions, and the board’s error state.
Read this part Focus on sending JSON, reading JSON responses and checking the response status. The list singles out one detail as the most important for Module 3: fetch does not reject just because the server answers 404 or 422, so your code has to check the status or ok itself.
GitHub Docs - Writing tests with GitHub Copilot (opens in a new tab)
Backs Part 3.5: let Copilot help brainstorm and draft tests, then verify the tests yourself.
Read this part Read the introduction and the Copilot Chat testing workflow. Notice how specific the test requirements need to be, and that verification comes after generation.
Practical references
Keep these open while you build and debug the Kanban board, check generated code, diagnose browser and API problems, or write tests. The list is clear that they are lookup references, not sit-and-read assignments.
FastAPI - Testing (opens in a new tab)
Use while adding backend tests for PATCH edge cases and status-transition behavior.
Read this part Focus on TestClient, naming test functions with test_, and using the client the way you would use httpx. Skip advanced deployment or async topics Module 3 does not use.
pytest - Documentation (opens in a new tab)
The reference for running pytest, reading its failures, and writing small, readable test functions.
Read this part Use it for lookup. For Module 3 you mainly need the naming conventions, how to run selected tests, and how to read failure output. The list warns against drifting into fixtures, plugins or large test architecture unless your instructor assigns it later.
MDN - DataTransfer (opens in a new tab)
Use while checking the dragstart and drop code that stores the task id with dataTransfer and sets the move behavior. The list notes it is more specific than the drag-and-drop overview and helps when Copilot generates confusing dataTransfer logic.
Read this part Focus on setData and getData, effectAllowed and dropEffect. Skip the clipboard and file-transfer sections.
VS Code Docs - Manage context for AI (opens in a new tab)
Use when Copilot answers from generic patterns instead of the actual Task Tracker files.
Read this part Focus on adding files, folders, symbols, terminal output and codebase context to chat, so your prompts are grounded in the files you are actually editing.
Optional deeper dives
Use these only after the core work is done, and selectively. The list says they go beyond what Module 3 needs and are not required for the quiz, the deliverables or grading.
GitHub Docs - Prompt engineering for GitHub Copilot Chat (opens in a new tab)
Extra practice writing prompts that carry context, constraints, examples and output expectations.
Read this part Read selectively. The Module 3 prompts already model the pattern; this is for learners who want broader Copilot prompting guidance.
Martin Fowler - Exploring Generative AI (opens in a new tab)
Broader practitioner context on AI-assisted software delivery, for after you finish the module. The list keeps it optional on purpose: Module 3 is a hands-on module, not a software engineering theory module.
Read this part Read selectively. Pick posts about human oversight, AI-assisted delivery practice or code review; do not treat the whole series as assigned reading.
Module 04 · Reading list
Module 4 · DevOps, CI/CD, Documentation & Team Workflows with AI
Core readings
Read these after the lecture. The list calls them the minimum supporting readings, mapped directly to the Module 4 demos, and estimates about 60 to 75 minutes in total if you read only the sections noted. Its rule for every source: when documentation and tutorials disagree with your repo, trust the repo and verify — read the diff, run the command, check the output, and refine.
Anthropic — Claude Code overview (opens in a new tab)
Why the module reaches for a terminal agent rather than only autocomplete or editor chat.
Read this part Read the overview sections on understanding a whole repo, working across several files and using tools. Skip the product-marketing detail and anything the Task Tracker repo does not need.
Anthropic — How Claude remembers your project (opens in a new tab)
The main supporting reading for CLAUDE.md and project memory.
Read this part Focus on CLAUDE.md files: what goes in them, when to update them, and what to do when Claude does not follow the instructions. Skip organization-wide memory and the advanced auto-memory detail unless it helps.
Docker Docs — Building best practices (opens in a new tab)
The main source for why a Dockerfile has to be more than merely buildable.
Read this part Focus on multi-stage builds, excluding files with .dockerignore, keeping images small, and the USER / non-root guidance. Skip the build-cloud and supply-chain sections for this module.
GitHub Docs — Responsible use of AI code review (opens in a new tab)
Reinforces that AI review supplements human review rather than replacing it. The link itself is GitHub’s page on responsible use of Copilot code review.
Read this part Focus on the limitations: missed issues, false positives, inaccurate suggestions, and the requirement to review and test before you act.
Practical references
Keep these open while you work in the Task Tracker repo and diagnose problems. The list says they are lookup references, not sit-and-read assignments.
Anthropic — Claude Code common workflows (opens in a new tab)
Use it while practising everyday Claude Code workflows: exploring code, planning before editing, testing and documentation tasks.
Read this part Focus on the prompt recipes and the plan-before-editing guidance. Skip subagents, parallel sessions and CI automation unless you are doing an optional extension.
Anthropic — Claude Code best practices (opens in a new tab)
A lookup reference for when Claude Code output starts drifting or you need a safer workflow.
Read this part Focus on environment setup, planning, reviewing diffs and keeping context useful. Leave the advanced scaling patterns until after the core module.
GitHub Docs — Workflow syntax for GitHub Actions (opens in a new tab)
Use it when reading or editing .github/workflows/ci.yml.
Read this part Look up on, jobs, steps, runs-on, uses, run and matrix only as you need them. Do not try to read the whole reference end to end.
Docker Docs — Multi-stage builds (opens in a new tab)
Use it when reviewing a generated Dockerfile that has a builder stage and a runtime stage.
Read this part Focus on multiple FROM statements and COPY --from. Adapt the examples to the Task Tracker FastAPI app rather than copying them blindly.
Docker Docs — Build context and .dockerignore (opens in a new tab)
Companion: Dockerfile reference — .dockerignore and USER (opens in a new tab)
Use it to check whether .env, .git, venv, build artifacts or other unneeded files are getting into the Docker build context.
Read this part Focus on how .dockerignore matching works and how the build context is sent to Docker. Keep it open while you review the COPY lines.
Optional deeper dives
Two kinds of extra reading. The four deeper dives are useful but not needed for the quiz or the deliverables; read them after the core and practical items. The two extension items cover ideas next to Module 4 that the slides and recordings do not teach; use them only after the core module work is finished.
HumanLayer — Writing a good CLAUDE.md (opens in a new tab)
A practitioner’s view of what makes a CLAUDE.md useful instead of bloated.
Read this part Read selectively for structure and examples, and do not copy the examples blindly into the Task Tracker repo.
Anthropic — Bringing Code Review to Claude Code (opens in a new tab)
Where Claude Code review was heading as a product feature at the time the list was written.
Read this part Read for context only. The module still teaches AI review as triage: Useful, Noise, Wrong.
adr.github.io — Architectural Decision Records hub (opens in a new tab)
Background on architectural decision records, decision logs and templates.
Read this part Read the overview and the template links only. Do not overcomplicate the Module 4 technical note.
AWS — ADR best practices (opens in a new tab)
A more team-oriented view of decision records: ADR meetings, ownership and decision quality.
Read this part Read selectively, and skip the organization and process sections that are too heavy for a small course repo.
Extension · GitHub Docs — Security for GitHub Actions (opens in a new tab)
A roadmap of Actions security topics such as artifact attestations and OIDC, most of it beyond the Task Tracker’s CI workflow.
Read this part Skim the overview only. The list adds that it does not replace the required checks: exact Python version, no swallowed failures, an intentional red run and a restored green run.
Extension · Anthropic Engineering — Claude Code auto mode (opens in a new tab)
For the curious: permissions and automation beyond the basic permission prompts shown in the module.
Read this part Read for the concept only. The course baseline stays conservative: inspect, approve deliberately, and verify.
Module 05 · Reading list
Module 5 · Security, Governance, Advanced Workflows & Looking Ahead
Core readings
Read these after the lecture. The list calls them the minimum supporting readings for Module 5 and estimates about 55 to 70 minutes in total if you read only the listed sections. Read selectively: each item’s “read this part” line tells you which section matters, so you do not have to read a whole standard or a long research paper.
OpenAI — Codex app (opens in a new tab)
The official reference for the desktop app surface the module teaches: choosing a project folder, working in threads, and staying grounded in the real repository instead of a generic chat.
Read this part Read the overview of the app as a command center, plus project threads, worktrees and the Git features. Skip the CLI, IDE extension, automations and advanced integrations for this module.
OpenAI — Custom instructions with AGENTS.md (opens in a new tab)
Why the module writes AGENTS.md before it asks Codex to review, plan or document anything in the repo.
Read this part Read what AGENTS.md is, how Codex reads it, and what belongs in project guidance: stack, commands, testing expectations, security notes and path boundaries.
OpenSSF — Security-Focused Guide for AI Code Assistant Instructions (opens in a new tab)
Backs up the module’s security posture: AI can assist, but the developer stays responsible for reviewing and editing what it generates.
Read this part Read the opening principles and the guidance on security-focused instructions. Keep it beside the security review, the governance retrospective and your personal AI usage rules.
OWASP — Secure Code Review Cheat Sheet (opens in a new tab)
Support for the manual scan you run after Codex produces its audit: concrete review lenses that go beyond a generic “is this secure?”
Read this part Focus on security-focused review, input validation, authentication, authorization, error handling, logging, data exposure and attack vectors, then translate the checklist into Task Tracker questions.
Martin Fowler / Thoughtworks — Context Engineering for Coding Agents (opens in a new tab)
The list calls this the most directly relevant practitioner reading for the context engineering activity.
Read this part Read about context engineering for coding agents, reusable instructions, files as context, and why focused context matters. Skip tool-specific details unless they help a comparison.
Practical references
These are not sit-and-read assignments. Keep them open while you set up Codex App and AGENTS.md, write the security review and governance worksheet, plan the comments feature, compare architecture docs and draft your playbook, or whenever you need a quick check.
OpenAI — Codex app review pane (opens in a new tab)
Keep open while you inspect diffs and decide what to keep, reject or comment on in Codex App.
Read this part Read what the review pane shows and how it helps you understand changes, give targeted feedback and decide what to keep.
OpenAI — Codex app settings (opens in a new tab)
For configuring the Codex App environment, editor and file behavior, and local workflow preferences.
Read this part Use only the settings that help you finish the module safely. Don’t spend time tuning the app before the docs-first deliverables are done.
AGENTS.md — Open format guide (opens in a new tab)
Examples of what belongs in an agent-facing project guidance file: overview, setup commands, testing commands, code style and security considerations.
Read this part Copy the structure, not the content. Your AGENTS.md should reflect the Task Tracker stack and the module’s boundaries: read first, docs first, reject unexpected app/ edits.
OWASP — Top Ten Web Application Security Risks (opens in a new tab)
Use while you grade Codex’s security findings and write the top-3 backlog.
Read this part Focus on the categories likely in a small web app: broken access control, injection, insecure design, security misconfiguration, vulnerable or outdated components, and logging and monitoring gaps.
GitHub Docs — Responsible use of GitHub Copilot code review (opens in a new tab)
A cross-tool reminder that AI review supplements human review rather than replacing it.
Read this part Read the capabilities, limitations, false positives, missed issues and how to improve review quality. Skip product setup.
GitHub Docs — Best practices for using GitHub Copilot (opens in a new tab)
Transferable context habits: give helpful context, keep the relevant files visible, and start a new conversation when the context stops helping.
Read this part Read the context-management advice. Skip the Copilot-specific setup unless you use Copilot outside this course.
Optional deeper dives
Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings and practical references.
Anthropic Engineering — Effective context engineering for AI agents (opens in a new tab)
A broader agent-engineering explanation of why context quality shapes agent behavior.
Read this part Read the introduction and the definition of context engineering. Skip the advanced orchestration details unless you build agent systems yourself.
LangChain — Context Engineering for Agents (opens in a new tab)
A compact vocabulary for context strategies beyond this module.
Read this part Focus on the write, select, compress and isolate categories, and map them back to strategies A, B and C rather than treating them as new required terms.
NIST — AI RMF Playbook (opens in a new tab)
For connecting your personal governance rules to a broader risk-management framework.
Read this part Skim the Govern, Map, Measure and Manage framing. Don’t try to apply the whole framework to the Task Tracker.
NIST — Generative AI Profile for the AI RMF (opens in a new tab)
Shows how a formal risk framework is extended for generative AI systems.
Read this part Read selectively for governance language about generative AI risk. Skip the detailed crosswalks and enterprise controls unless you need them at work.
Research papers on AI-generated code security (opens in a new tab)
Companion: Frontiers in Big Data — SLR on AI models and code-generation security (opens in a new tab)
Companion: arXiv — Security Weaknesses of Copilot-Generated Code in GitHub Projects (opens in a new tab)
For instructors or advanced students who want the evidence behind the claim that AI-generated code still needs a security review. The main link is the arXiv paper “Security Vulnerabilities in AI-Generated Code: A Large-Scale Analysis.”
Read this part The suggested order: skim the large-scale GitHub analysis abstract, then the systematic literature review, then the empirical study of Copilot-generated code if you want more depth.
Prompt libraries
Every prompt, by module and by part.
Module 1 · Mindset, Foundations & Prompt Engineering
Practical prompts for AI-assisted requirements, architecture, and scaffolding.
Foundation prompts from the lecture P0 Start a fresh conversation with a context block · P1 Compare first-contact tool outputs · P2 Rewrite a vague debugging prompt using the four-part anatomy · P3 Review an API endpoint with a professional role · P4 Generate a constrained Task Tracker validation function · P5 Use a few-shot example for user stories
Hands-on prompt chain A1 Generate reviewed Task Tracker user stories · A2 Fix scope violations in requirements · A3 Add missing edge cases and status rules · A4 Review requirements for testability · B1 Generate two lightweight architecture proposals · B2 Compare architecture proposals using course criteria · B3 Check your ADR without letting AI write it for you · C1 Scaffold the minimal FastAPI project skeleton · C2 Inspect the scaffold before running it · C3 Diagnose an exact run/test failure · D1 Draft the Module 1 reflection log from your notes
Optional extension — specific scaffold diagnostics E1 Specific diagnostic: missing dependency · E2 Specific diagnostic: import path or project root issue · E3 Specific diagnostic: Pydantic v1 versus v2 syntax risk
Module 2 · From Idea to Backend Implementation with AI
From Idea to Backend Implementation with AI
2.0 Tool setup T0.1 First verified interaction: explain the existing /health endpoint · T0.2 Confirm project context before a code-generation prompt
2.1 Data model A1 Generate the data model and storage layer · A2 Fix model validation failures from verify_a.py · A3 Fix storage or import-check failures
2.2 CRUD endpoints B1 Vague versus strict prompt for POST /tasks · B2.1 Add GET /tasks list endpoint · B2.2 Add GET /tasks/{task_id} endpoint · B2.3 Add PATCH /tasks/{task_id} endpoint without transition logic yet · B2.4 Add DELETE /tasks/{task_id} endpoint · B3 Fix endpoint verification failures
2.3 Business rules C1 Add status-transition validation · C2 Fix transition matrix failures
2.4 API tests D1 Generate the pytest API test suite · D2 Fix pytest failures with explicit test-versus-production reasoning · D3 Diagnose Break Test results
Deliverables E1 Create the prompt comparison log · E2 Write the Module 2 reflection log
Optional extension prompts O1 Explain pytest or framework warnings · O2 Generate a final API summary checklist
Module 3 · Frontend, Testing & Debugging with AI
Practical prompts for frontend, testing, refactoring, and debugging
Foundation prompts P0 Start a Module 3 conversation with context · P1 Verify the assistant reads app/main.py · P2 Ask for a plan before code
Part 3.2 - Build the Kanban board B1 Create the static Kanban layout first · B2 Add fetch and render logic · B3 Add loading, empty, ready, and error states · B4 Diagnose CORS or browser fetch failure from evidence · B5 Add drag-and-drop with PATCH and rollback
Part 3.3 - Build the create/edit modal form C1 Plan the modal flows before editing · C2 Add the create/edit modal in a focused way · C3 Diagnose a failing modal flow from Network tab evidence
Part 3.4 - Refactor what you just built D1 Write the 8-behavior refactor contract · D2 Refactor one selected section safely · D3 Review a diff for regression risk · D4 Recover one regression surgically
Part 3.5 - Test and debug what you built E1 Brainstorm PATCH edge cases · E2 Generate one pytest test · E3 Prove a generated test by deliberate breakage · E4 Diagnose pytest failure from output only
End-of-module deliverable prompt R1 Write the debugging log and reflection from your notes
Optional extension O1 Review accessibility and keyboard behavior · O2 Polish the visual design after behavior works
Module 4 · DevOps, CI/CD, Documentation & Team Workflows with AI
Practical prompts for Claude Code, CI/CD, Docker, documentation, code review, and technical notes
Claude Code setup and safety S0 Start a safe Claude Code session · S1 Repair CLAUDE.md after /init · S2 Verify Claude’s understanding against code · S3 Plan a small change without editing
CI pipeline prompts C1 Generate the GitHub Actions CI workflow · C2 Review CI YAML for false-green patterns · C3 Prove CI with green -> red -> green evidence
Docker and containerization prompts D1 Generate Dockerfile and .dockerignore · D2 Create the Docker verification and security log
Documentation prompts DOC1 Generate docstrings without changing logic · DOC2 Rewrite README with exact commands · DOC3 Create a claim-vs-reality documentation audit
AI-assisted code review prompts R1 Run a focused AI review on a real diff · R2 Triage AI review comments into Useful, Noise, Wrong
Technical note and reflection prompts T1 Draft a technical note from evidence files · T2 Review the rewritten technical note without replacing it · X1 Check final deliverables and write the tool-fit reflection
Optional extension OE1 Turn a repeated workflow into a reusable checklist or Skill
Module 5 · Security, Governance, Advanced Workflows & Looking Ahead
Practical prompts for Codex App review, governance, planning, context engineering, and personal AI playbooks.
Setup prompts — Part 5.1 5.1A Start a Codex App thread with Module 5 guardrails · 5.1B Draft or review AGENTS.md · 5.1C Project evidence smoke test · 5.1D Recent files smoke test
Security review prompts — Part 5.2 5.2A Run a read-only security audit · 5.2B Grade AI security findings · 5.2C Reconcile manual scan with AI findings · 5.2X Optional minimal one-line fix
Governance prompts — Part 5.3 5.3A Classify what you shared with AI · 5.3B Trace one generated block line by line · 5.3C Turn notes into concrete AI usage rules
Feature planning prompts — Part 5.4 5.4A Create a generic comments feature plan · 5.4B Create a repo-grounded comments feature plan · 5.4C Critique and compare feature plans
Context engineering prompts — Part 5.5 5.5A Architecture doc with minimal context · 5.5B Architecture doc with structured context · 5.5C Architecture doc with targeted context · 5.5D Compare context strategies
Personal AI playbook prompts — Part 5.6 5.6A Draft a playbook template only · 5.6B Review playbook for evidence and voice · 5.6C Decision Card challenge
Projects
The two checkpoints, and the evidence behind them.
Midcourse project · Two features, one AI-assisted workflow
The midcourse checkpoint. You add two small, end-to-end features to the Task Tracker you built in Modules 1 to 3, and you show the evidence that you planned, prompted, inspected, tested, refactored and debugged them yourself. Six short lessons walk through the brief, and a worked example shows one student’s real submission.
Pages What is assessed · Choosing features · Workflow loop · Tests and Break Tests · Five docs files · Submission and rubric · Worked example · Source guide
Final project · A teammate-maintainable release
The end-of-course project turns the Task Tracker into something a teammate could pick up tomorrow: a README they can follow, an AGENTS.md an AI tool can follow, CI that fails when tests fail, a safe container, a clean repository, and documents in docs/ that are backed by evidence rather than by confident prose.
Pages Teammate-maintainable · Required contents · Secrets and data · Evidence · Ownership · Submit and rubric · Course resources · Worked example · Source guide