- Use these prompts while working in the Task Tracker repository. The library assumes you are running Claude Code from the repo root with a corrected CLAUDE.md already in place.
- Replace placeholders such as [PASTE DIFF HERE] or <branch-name> before sending. Never send a prompt with a placeholder still inside it.
- Use plan mode, or ask for a plan, before large edits. For prompts that change files, add “show me the diff before applying” when you want a pause to inspect.
- Treat every output as a draft: read the diff, run the command, inspect the logs, test the behavior, and refine from evidence.
- Keep proof. The Module 4 deliverables rest on evidence: CI logs, Docker commands, /health output, whoami output, claim-vs-reality notes and review classifications.
- Use the optional extension only for extra practice. It is not part of the core lecture flow.
- Work through the prompts in the module’s own order: Claude Code setup → CI → Docker → documentation → code review → technical note → deliverable reflection.
Key mindset AI proposes; you approve only after inspection and verification. The stronger the tool scope, the stricter your evidence should be.
S0 · S1 · S2 · S3
Claude Code setup and safety
The library’s core prompts are written for Claude Code unless a prompt says otherwise, and they are deliberately specific because Module 4 artifacts can look correct while hiding serious mistakes. These four open a session safely, repair the /init draft of CLAUDE.md, check Claude’s answers against the code, and practise plan mode before any edit.
S0 · Start a safe Claude Code session
Use at the beginning of Part 4.1 or whenever you reopen Claude Code for Module 4 work.
Weak versionSet up Claude Code for this project.
Improved version · S0I am working in the Module 4 Task Tracker repository. Before making any edits, help me verify that Claude Code is safely set up for this repo. Task: 1. Confirm the current working directory and explain what repository you think this is. 2. Tell me which files you would inspect first to understand the app. 3. Do not edit files yet. 4. Do not run tests yet. 5. List the next three safe setup checks I should perform, including /status and whether CLAUDE.md exists. Output format: Return a short checklist with: Check, Why it matters, Evidence I should look for.
Why it is betterIt turns setup into a safety checklist instead of asking the agent to “just set up” the environment. It also blocks premature edits and commands. Required verification: Confirm the repo path, run /status yourself, and check that Claude did not modify files.
Then ask Now read CLAUDE.md, app/main.py, and app/models.py. List only the project facts you can verify from those files, and mark anything uncertain as [VERIFY].
The mistake it avoidsStarting a repo-level agent in the wrong folder or letting it edit before you know what it can see.
Claude Code setup / repo safety · Prompt library pp. 2-3
S1 · Repair CLAUDE.md after /init
Use after running /init. The generated file is a draft, not a deliverable.
Weak versionFix my CLAUDE.md.
Improved version · S1You generated CLAUDE.md with /init. I want to correct it for the Module 4 Task Tracker. Read these files before proposing changes: - @CLAUDE.md - @app/main.py - @app/models.py - @requirements.txt - @README.md if it exists Task: Revise CLAUDE.md so it includes these sections in this order: 1. Tech stack: Python 3.11, FastAPI, Pydantic v2, Uvicorn, pytest, httpx, and vanilla JavaScript frontend if present. 2. Exact run command used in this course: uvicorn app.main:app --reload --port 8000. 3. Exact test command used in this course: pytest -v. 4. Architecture summary: backend files, frontend files, tests, and where task rules live. 5. Business rules: task status values and transition rules as implemented in the code. Do not guess; mark [VERIFY] if uncertain. 6. UI states and CORS notes if present in the repo. 7. Do-not rules: do not add auth, a database, deployment steps, or major UI changes without asking. Constraints: - Do not change application code. - Do not invent versions or rules. - Show me the diff before applying. Output format: First show a concise summary of proposed changes. Then show the diff.
Why it is betterIt reflects the actual lecture: run /init, then hand-correct CLAUDE.md with project-specific facts, commands, business rules, and do-not rules. Required verification: Read the diff, run the run/test commands from the file, and compare status rules to app/models.py.
Then ask Review the updated CLAUDE.md for any generic FastAPI statements that are not true for this repo. List the questionable lines and the source file that should verify each one.
The mistake it avoidsCommitting a generic or guessed CLAUDE.md and teaching every future Claude Code session the wrong project memory.
Project memory / CLAUDE.md · Prompt library pp. 3-4
S2 · Verify Claude’s understanding against code
Use after CLAUDE.md is corrected. The lecture asks for two verified Claude responses.
Weak versionExplain this app.
Improved version · S2Read @app/main.py and @app/models.py. Task: Answer these two questions using only evidence from those files: 1. What endpoints does the Task Tracker expose, and what status codes do they return where visible? 2. What task status values and transition rules are implemented? Constraints: - Do not rely on memory or guesses from CLAUDE.md alone. - Cite the file and function/model name for each claim. - If a behavior is unclear, mark it [VERIFY] instead of guessing. Output format: Return a table with columns: Claim, Evidence file/function, Confidence, What I should manually check.
Why it is betterIt trains students to verify Claude’s answers against source files, not against fluent explanation. Required verification: Open the cited files and confirm at least two claims line by line.
Then ask Now ask me which two claims I manually verified, and help me turn them into a short “verified interaction” note for my Module 4 deliverables.
The mistake it avoidsUsing Claude’s explanation as evidence instead of checking app/main.py and app/models.py yourself.
Repo understanding / evidence-based answers · Prompt library pp. 4-5
S3 · Plan a small change without editing
Use as a safe practice task for plan mode and permissions before larger Module 4 edits.
Weak versionAdd a version endpoint.
Improved version · S3Plan only. Do not edit files. I may later add a GET /version endpoint to the Task Tracker, but for now I only want a plan. Read @app/main.py and tell me: 1. Which file would need to change. 2. The smallest route you would add. 3. Whether tests should be added or updated. 4. What command I should run to verify it. 5. What risks or scope creep to avoid. Constraints: - Do not modify any file. - Do not add dependencies. - Do not add Docker, CI, auth, database, or frontend changes. Output format: Return a numbered plan and wait for approval.
Why it is betterIt makes plan mode concrete: Claude can reason and propose, but the student decides before any edit happens. Required verification: Check that no files changed. Then decide whether the plan is worth implementing.
Then ask Before editing, show me the exact diff you would apply and explain how I would test it.
The mistake it avoidsTreating a small-sounding request as permission for the agent to edit multiple files without a plan.
Plan mode / permission practice · Prompt library p. 5
C1 · C2 · C3
CI pipeline prompts
Generate the GitHub Actions workflow, inspect it for false-green shortcuts, then prove it with a deliberate green → red → green run.
C1 · Generate the GitHub Actions CI workflow
Use in Part 4.2 when creating .github/workflows/ci.yml.
Weak versionMake CI for this repo.
Improved version · C1Create .github/workflows/ci.yml for the Module 4 Task Tracker. Project context: - Python 3.11 FastAPI backend. - Tests run with pytest -v. - Dependencies are installed from requirements.txt. - This module is not deploying the app. Requirements: - Run on push and pull_request. - Use actions/checkout and actions/setup-python. - Use Python 3.11, not latest or an unspecified version. - Install dependencies with python -m pip install --upgrade pip and pip install -r requirements.txt. - Run pytest -v. - Do not include deployment steps. - Do not use continue-on-error. - Do not use || true. - Do not use --exit-zero. - Do not hide pytest failures behind pipes or summary steps. Constraints: - Show me the diff before applying. - If .github/workflows does not exist, create it at the repository root, not inside app/ or another subfolder. Output format: First summarize the workflow. Then show the YAML diff.
Why it is betterIt asks for the exact CI artifact taught in the lecture and blocks the false-green shortcuts the instructor warns about. Required verification: Inspect the YAML, commit it on a branch, push it, and read the GitHub Actions logs.
Then ask Before I commit this, review the YAML line by line and tell me whether any line could allow tests to fail while the workflow still passes.
The mistake it avoidsAccepting a green-looking workflow that skips tests, uses the wrong Python version, or is placed in the wrong directory.
CI / GitHub Actions · Prompt library pp. 5-6
C2 · Review CI YAML for false-green patterns
Use after C1 and before trusting the first green GitHub Actions run.
Weak versionCheck my CI file.
Improved version · C2Review @.github/workflows/ci.yml for Module 4 CI safety. Task: Check for these issues: 1. Missing push or pull_request trigger. 2. Python version not pinned to 3.11. 3. Workflow installed dependencies but never runs pytest. 4. continue-on-error. 5. || true. 6. --exit-zero. 7. pytest output piped in a way that can hide the exit code. 8. Deployment steps that do not belong in this module. 9. Workflow file located in the wrong folder. Constraints: - Do not rewrite the file unless you find an issue. - If you suggest an edit, explain the exact risk first. Output format: Return a table with columns: Check, Pass/Concern, Evidence, Minimal fix.
Why it is betterIt turns the lecture’s “inspect YAML line by line” instruction into a repeatable review checklist. Required verification: Manually search the file for the dangerous patterns and compare Claude’s review to your own review.
Then ask If every check passes, give me the exact Git commands to commit this workflow on my current branch.
The mistake it avoidsAssuming the workflow is safe because the YAML looks professional or because the first run is green.
CI inspection / failure-swallowing checks · Prompt library pp. 6-7
C3 · Prove CI with green -> red -> green evidence
Use after the first successful GitHub Actions run. This is the proof that CI actually catches failures.
Weak versionMy CI passed. What now?
Improved version · C3Help me plan the Module 4 CI proof without making edits yet. Current state: - The GitHub Actions workflow exists. - I need evidence that CI fails when tests fail and passes again after I restore the code. Task: Give me a safe green -> red -> green checklist: 1. Confirm the current branch and clean working tree. 2. Pick the smallest test assertion or test file to break temporarily. 3. Tell me exactly what kind of one-line change would make pytest fail. 4. Tell me the local command to confirm the failure. 5. Tell me the git commit/push sequence for the intentional red run. 6. Tell me how to restore the test and confirm the final green run. Constraints: - Do not edit files yet. - Do not suggest breaking production code; break only a test or test expectation. - The red run must be intentional and reversible. Output format: Return a numbered checklist plus a short evidence log template.
Why it is betterIt captures the instructor’s key CI lesson: a green check only matters if failure turns it red. Required verification: Save links or screenshots for the green run, intentional red run, and restored green run.
Then ask Here is my Actions log from the red run: [PASTE LOG]. Does it prove pytest failed for the reason I intended?
The mistake it avoidsTreating a single green CI run as proof that the pipeline is exercising the tests.
CI verification / red-run proof · Prompt library pp. 7-8
D1 · D2
Docker and containerization prompts
Draft a multi-stage Dockerfile and .dockerignore, then turn the build, run, /health and whoami checks into a short security log.
D1 · Generate Dockerfile and .dockerignore
Use in Part 4.3 to package the Task Tracker after CI exists.
Weak versionDockerize this app.
Improved version · D1Create a Dockerfile and .dockerignore for the Module 4 Task Tracker. Project context: - Python 3.11 FastAPI app. - App command should run uvicorn app.main:app --host 0.0.0.0 --port 8000. - The app exposes /health. - This module is not adding a database, auth, or deployment. Dockerfile requirements: - Use a multi-stage build. - Use a Python 3.11 slim base image. - Install dependencies from requirements.txt. - Copy only what the runtime needs. - Create a non-root user named app. - Switch to USER app before CMD. - Expose port 8000. - Do not bake secrets into the image. - Do not use python:latest. - Do not use uvicorn --reload in the container CMD. .dockerignore requirements: Exclude .env, .git, venv, .venv, __pycache__, .pytest_cache, node_modules if present, build artifacts, and local OS/editor files. Constraints: - Show me the diff before applying. - Do not modify application logic. Output format: First summarize the design. Then show the Dockerfile and .dockerignore diff.
Why it is betterIt keeps Docker aligned to the lecture demo: multi-stage, slim runtime, non-root user, no secrets, and a verifiable /health endpoint. Required verification: Build the image, run it, curl /health, and verify docker exec tt-dev whoami returns app.
Then ask Review the Dockerfile and identify any line that could copy secrets, run as root, or make the image larger than necessary.
The mistake it avoidsStopping at “docker build succeeded” instead of checking whether the image is safe and behaves correctly.
Docker / containerization · Prompt library pp. 8-9
D2 · Create the Docker verification and security log
Use after generating Dockerfile and .dockerignore.
Weak versionCheck if my Dockerfile is good.
Improved version · D2Help me verify the Docker artifacts for Module 4. Files to inspect: - @Dockerfile - @.dockerignore Task: Give me exact terminal commands to verify: 1. The image builds. 2. The container starts on port 8000. 3. GET /health responds from inside the running container mapping. 4. The container user is app, not root. 5. .dockerignore excludes .env, .git, virtual environments, and caches. 6. The Dockerfile does not copy secrets or use python:latest. Use these names unless there is a conflict: - image: task-tracker:dev - container: tt-dev Output format: Return: 1. Commands to run. 2. Expected evidence. 3. A 3-line security log template: non-root, slim base, no baked secrets.
Why it is betterIt turns the demo’s verification commands into a reusable evidence checklist students can paste into their deliverables. Required verification: Run the commands yourself and copy the actual outputs into the log.
Then ask Here is my command output: [PASTE OUTPUT]. Fill in my 3-line security log and flag anything I should re-check.
The mistake it avoidsLetting Claude judge Docker quality without requiring runtime evidence.
Docker verification / evidence log · Prompt library pp. 9-10
DOC1 · DOC2 · DOC3
Documentation prompts
Docstrings that change no logic, a README whose commands actually run, and a claim-vs-reality audit of both.
DOC1 · Generate docstrings without changing logic
Use in Part 4.4 when adding documentation to public functions and route handlers.
Weak versionAdd docs to my code.
Improved version · DOC1Add Google-style docstrings to the Task Tracker code. Scope: - Public functions and FastAPI route handlers in app/. - Include summary, Args, Returns, Raises, and route examples where relevant. Rules: - Read the actual function bodies before writing docstrings. - Do not change runtime logic. - Do not rename functions, routes, models, or fields. - Do not invent validation behavior. - If a behavior is unclear, write [VERIFY] in the docstring comment or list it for me instead of guessing. - Show me the diff before applying. Output format: First list which files/functions you will document. Then show the diff.
Why it is betterIt reflects the lecture’s warning that documentation can sound right while being wrong, and it prevents documentation work from becoming a hidden code change. Required verification: Diff the code and confirm only documentation changed. Then spot-check at least three docstrings.
Then ask Pick three docstrings you just added and make a claim-vs-reality table comparing each docstring to the actual function body.
The mistake it avoidsAccepting fluent docstrings that document behavior the code does not actually implement.
Documentation / docstrings · Prompt library pp. 10-11
DOC2 · Rewrite README with exact commands
Use after code/docstrings are stable and Docker/CI files exist.
Weak versionMake a better README.
Improved version · DOC2Rewrite README.md for the Module 4 Task Tracker. Read these files first: - @README.md if it exists - @CLAUDE.md - @requirements.txt - @Dockerfile - @.github/workflows/ci.yml if present - @app/main.py Required sections: 1. Project overview. 2. Prerequisites. 3. Local setup. 4. Run the app locally. 5. Run tests. 6. Run with Docker. 7. CI workflow summary. 8. Project structure. 9. Project conventions and current limitations. 10. Link to docs/decisions if a technical note exists. Constraints: - Every command must be copy-pasteable from the repo root. - Use the course commands: uvicorn app.main:app --reload --port 8000 and pytest -v unless the repo proves otherwise. - Do not claim deployment, auth, database, or production readiness. - Mark anything uncertain as [VERIFY]. - Show me the diff before applying. Output format: First list any [VERIFY] items. Then show the README diff.
Why it is betterIt makes the README match the actual Module 4 artifacts: run/test commands, Docker, CI, conventions, limitations, and decision notes. Required verification: Run the documented commands where practical and correct any mismatch.
Then ask Review the README as a fresh student. Which commands should I run, in order, to prove it works from a clean checkout?
The mistake it avoidsWriting a polished README that a new student cannot actually follow.
Documentation / README · Prompt library pp. 11-12
DOC3 · Create a claim-vs-reality documentation audit
Use after DOC1 and DOC2. This supports the deliverable requiring AI inaccuracies caught and resolved.
Weak versionCheck the docs.
Improved version · DOC3Audit the documentation changes for claims that might not match the code. Inspect: - The docstrings changed in this branch. - @README.md - @app/main.py - @app/models.py - The running FastAPI /docs page if I paste details from it. Task: Find at least two documentation claims that need verification, especially around: - status transition behavior - response status codes such as POST 201 or DELETE 204 - validation errors and HTTP 422 - request/response schema names - run, test, and Docker commands Constraints: - Do not change files yet. - Do not invent inaccuracies. If no issue is found, list the most important claims I should manually check. Output format: Return a table with columns: Documentation claim, Code or runtime reality, Resolution, Evidence to keep.
Why it is betterIt directly supports the lecture deliverable: verified documentation plus a short log of AI inaccuracies caught and fixed. Required verification: Confirm each issue against code or a real runtime/API-docs observation before editing docs.
Then ask Here are the two inaccuracies I confirmed: [PASTE]. Help me write the final claim-vs-reality log in concise student-friendly language.
The mistake it avoidsTreating documentation as done because it reads well instead of verifying high-risk claims.
Documentation verification / claim-vs-reality log · Prompt library pp. 12-13
R1 · R2
AI-assisted code review prompts
A focused review of a real diff that must cite evidence, followed by triage of every comment into Useful, Noise or Wrong.
R1 · Run a focused AI review on a real diff
Use in Part 4.5 on a real branch diff or commit.
Weak versionReview my code.
Improved version · R1Review the current branch diff against main for the Module 4 Task Tracker. Task: Review only issues you can substantiate from the diff or nearby code. Focus on: - correctness - tests - Docker or CI safety if those files changed - documentation claims if README/docstrings changed - scope creep beyond the module Constraints: - Do not rewrite the code. - Do not comment on personal style unless it affects readability or maintainability. - Do not invent risks that are not supported by the diff. Output format: For each comment, return: - file:line or file/section - severity: high | medium | low - category: correctness | test | CI | Docker | docs | maintainability | scope - issue in one sentence - evidence from the diff or nearby code - suggested minimal fix If there are no substantive comments, say so.
Why it is betterIt channels Claude into a review role while requiring evidence, which makes later triage easier. Required verification: Open the relevant file/line for every comment before deciding whether it is Useful, Noise, or Wrong.
Then ask Now convert your comments into a review log template where I can label each one Useful, Noise, or Wrong.
The mistake it avoidsLetting AI review become a substitute for human review or acting on comments with no evidence.
Code review / AI-assisted review · Prompt library pp. 13-14
R2 · Triage AI review comments into Useful, Noise, Wrong
Use immediately after R1. This is the main skill in Part 4.5.
Weak versionWhich review comments should I fix?
Improved version · R2Help me triage these AI review comments. Definitions: - Useful: catches a real issue or important improvement. - Noise: technically okay but not worth acting on. - Wrong: misreads the code, invents a problem, or ignores evidence in another file. AI review comments: [PASTE COMMENTS HERE] My manual notes or code evidence: [PASTE NOTES OR SAY “none yet”] Task: For each comment, assign Useful, Noise, or Wrong. Constraints: - If evidence is missing, label the comment “Needs manual check” instead of guessing. - Do not recommend code changes for Noise or Wrong comments. - Only Useful comments should become action items. Output format: Return a table with columns: Comment summary, Bucket, Evidence needed or evidence found, Action.
Why it is betterIt makes the difference between AI review output and human judgment explicit. Required verification: Verify each bucket against the actual diff and record a one-sentence reason.
Then ask Compare these buckets with my human review notes: [PASTE NOTES]. What did Claude catch that I missed, and what did I catch that Claude missed?
The mistake it avoidsFixing imaginary bugs from Wrong comments or ignoring Useful comments because the review output was noisy.
Code review / triage · Prompt library pp. 14-15
T1 · T2 · X1
Technical note and reflection prompts
Claude drafts the six-section decision note and reviews your rewrite without replacing it; X1 closes the module with a deliverable check and the tool-fit reflection.
T1 · Draft a technical note from evidence files
Use in Part 4.6 to draft the six-section note before rewriting it yourself.
Weak versionWrite my technical note.
Improved version · T1Draft a technical decision note for the Module 4 Task Tracker. Topic: [CHOOSE ONE: in-memory task storage | status transition rules | CI workflow design | Dockerfile design | documentation verification approach] Read the most relevant files first. Use only the files that apply: - @app/main.py - @app/models.py - @Dockerfile - @.dockerignore - @.github/workflows/ci.yml - @README.md - @CLAUDE.md Required sections: 1. Context 2. Decision 3. Alternatives Considered 4. Trade-offs 5. Consequences 6. Open Questions Rules: - This is a draft only. - Mark uncertain claims as [VERIFY]. - Do not pretend the app has auth, a database, deployment, or production hardening. - Keep the Decision section clear and unhedged. - Prefix the Trade-offs and Open Questions sections with “DRAFT - REWRITE IN MY OWN WORDS”. - Include a placeholder sentence: “I would do this differently by...” Output format: Return Markdown only.
Why it is betterIt lets Claude help with structure while preserving the lecture’s ownership rule: the student must rewrite the reasoning, trade-offs, and open questions. Required verification: Rewrite the note manually, especially Trade-offs and Open Questions, before saving it.
Then ask Ask me three questions that would help make the trade-offs and open questions more specific to my actual project experience.
The mistake it avoidsSubmitting an AI-written decision note that sounds polished but does not capture the student’s real reasoning.
Technical note / decision writing · Prompt library pp. 15-16
T2 · Review the rewritten technical note without replacing it
Use after you rewrite the note in your own voice.
Weak versionMake my note better.
Improved version · T2I rewrote this technical note myself. Review it, but do not replace it. Task: Check whether the note includes: - Context that explains the problem and why it matters now. - A clear Decision paragraph. - At least two real alternatives. - Trade-offs that are specific to this Task Tracker, not generic AI prose. - Consequences of the decision. - Real Open Questions. - One sentence that starts with “I would do this differently...” - A README link plan. Constraints: - Do not rewrite the whole note. - Do not polish my voice away. - Suggest minimal edits only. Output format: Return a checklist with columns: Requirement, Present/Missing, Minimal suggestion. My note: [PASTE NOTE HERE]
Why it is betterIt uses Claude as a reviewer, not as the author of the final decision record. Required verification: Read the note aloud. It should sound like a real decision you made, not a generic design document.
Then ask Now give me only the 3 highest-priority edits I should make before saving this under docs/decisions/.
The mistake it avoidsLetting AI replace the student’s voice and reasoning at the final step.
Technical note / human-owned revision · Prompt library pp. 16-17
X1 · Check final deliverables and write the tool-fit reflection
Use at the end of Module 4 after all artifacts exist.
Weak versionWrite my Module 4 reflection.
Improved version · X1Use only the notes and evidence I provide. Do not invent results. Task: Help me prepare my Module 4 final checklist and reflection. Evidence I have: - Claude Code setup: [PASTE STATUS] - CLAUDE.md verification notes: [PASTE] - CI green/red/green evidence: [PASTE LINKS OR NOTES] - Docker /health and whoami evidence: [PASTE] - Documentation claim-vs-reality log: [PASTE] - AI review triage summary: [PASTE] - Technical note path and README link: [PASTE] Reflection requirement: Compare Copilot, Cursor, and Claude Code for different task types. Do not declare a single winner. Explain which workflow fits which engineering task. Output format: 1. Deliverable checklist with Complete / Missing. 2. Reflection draft with one short paragraph per tool. 3. Missing evidence I still need to collect.
Why it is betterIt keeps the reflection evidence-based and aligns the tool comparison with the instructor’s recap: Copilot, Cursor, and Claude Code serve different scopes. Required verification: Check every item against files, logs, screenshots, or notes before submitting.
Then ask Make the reflection more concise, but still use only my evidence and keep the tool-fit comparison.
The mistake it avoidsWriting a generic reflection that claims success without pointing to actual Module 4 evidence.
End-of-module deliverables / reflection · Prompt library pp. 17-18
OE1
Optional extension
The library says this section is useful but not core Module 4 content. Use it only after the required workflow is complete.
OE1 · Turn a repeated workflow into a reusable checklist or Skill
Use only if you repeatedly perform the same review and your environment supports project-level Claude Code Skills. This was not part of the core lecture sequence.
Weak versionCreate a Claude Skill for reviews.
Improved version · OE1Optional extension only. Do not treat this as a Module 4 required deliverable. I want to capture one repeated Module 4 workflow as a reusable checklist or Claude Code Skill. Workflow to capture: [CHOOSE ONE: CI safety review | Docker security log | documentation claim-vs-reality audit | AI review triage] Task: Draft a project-scoped reusable instruction with: 1. Name. 2. When to use it. 3. Inputs required. 4. Steps to follow. 5. Output format. 6. Safety limits: files it may read, files it may not edit, and commands it must not run without approval. Constraints: - Do not save files until I approve. - Prefer a plain Markdown checklist if Skills are not available in my Claude Code setup. - Keep the workflow aligned with Module 4 evidence requirements. Output format: Show me the full draft first.
Why it is betterIt preserves the useful idea from the old prompt library while clearly marking it as outside the core lecture. Required verification: Use this only after the core deliverables are complete.
Then ask Convert this into a plain docs/checklists/<name>.md file instead of a Claude Code Skill.
The mistake it avoidsTurning advanced tool features into required course work before students have mastered the core verification loop.
Optional extension / reusable workflow · Prompt library pp. 18-19
End-of-module checklist
The library closes with what you should have produced and saved before moving on.
| Prompt | Use | Module connection |
|---|---|---|
| S0 | Start safe Claude Code session | Part 4.1 / setup |
| S1 | Repair CLAUDE.md after /init | Part 4.1 / memory |
| S2 | Verify repo answers | Part 4.1 / evidence |
| S3 | Plan-only safety check | Part 4.1 / plan mode |
| C1 | Generate CI workflow | Part 4.2 / CI |
| C2 | Inspect CI YAML | Part 4.2 / inspection |
| C3 | Prove green -> red -> green | Part 4.2 / proof |
| D1-D2 | Dockerfile + .dockerignore | Part 4.3 / Docker |
| DOC1-DOC3 | Docs + claim-vs-reality log | Part 4.4 / docs |
| R1-R2 | AI review + triage | Part 4.5 / review |
| T1-T2 | Technical note | Part 4.6 / note |
| X1 | Checklist + reflection | Module 4 closeout |
| OE1 | Optional reusable workflow | Optional extension |
Read with careThe library has no separate end-of-module checklist; this is its quick-reference table. X1 is its closing deliverable check.