AI-Assisted Coding · Module 04
DevOps, CI/CD, Documentation & Team Workflows with AI
No new features. Wrap the Task Tracker in the artifacts it needs to be shared, and prove each one works.
Seven lessons on the engineering layer around a working app: picking the right AI surface, giving Claude Code real project memory, a CI pipeline proved green → red → green, a safer container, documentation checked claim by claim, AI review as triage, and a decision note in your own voice.
- AI surface by scope
- Claude Code + CLAUDE.md
- CI green → red → green
- Multi-stage Docker
- Claim vs. reality
- Review triage
- Decision notes
Module introduction
From building features to shipping them
By now the Task Tracker works: it has requirements, scaffolded code, tests and features from the earlier modules. Module 4 adds nothing the user can see. Instead it wraps the app in the artifacts a team needs to share, maintain, review and eventually ship it: project memory for the agent, a CI workflow, a Docker image, documentation, an AI-assisted review and a technical decision note. The loop is the one you already know, ask, inspect, run, test, refine. What changes is scope. Claude Code works across the whole repository from the terminal, so one careless approval can touch several files at once. That is why every artifact in this module needs evidence before you accept it.
- 4.1Project memoryCLAUDE.md + two verified answers
- 4.2CIgreen → red → green
- 4.3Docker/health + whoami = app
- 4.4Documentationclaim-vs-reality log
- 4.5ReviewUseful / Noise / Wrong
- 4.6Decision noteyour voice, linked from README
The sequence is continuous: each step produces an artifact that a later step can inspect or explain.
Your learning path