AI-Assisted Coding · Midcourse project

Two features, one AI-assisted workflow

Extend the Task Tracker, and prove you stayed in charge of the AI.

The midcourse checkpoint. You add two small, end-to-end features to the Task Tracker you built in Modules 1 to 3, and you show the evidence that you planned, prompted, inspected, tested, refactored and debugged them yourself. Six short lessons walk through the brief, and a worked example shows one student’s real submission.

  • Process over features
  • Feature options
  • Small-loop workflow
  • Break Tests
  • Five docs files
  • Met / Not Met

Project introduction

The feature is the vehicle. The process is the test.

By the end of Module 3 your Task Tracker has a FastAPI backend with tests and a Kanban board in the browser. The midcourse project asks you to add two small features to it. The brief is direct about what it is really checking: not how ambitious the features are, but whether you can use AI tools to plan, implement, test, refactor and debug a real code change without giving up ownership of the work. You get a Met or Not Met result, not a grade. These lessons take the brief part by part: what is assessed, how to choose your two features, the small loop each feature goes through, the tests and Break Tests that prove it, the five documentation files, and how you submit.

The project at a glance · Midcourse brief pp. 1-3
  1. StartBaselineNew branch, run the app and the existing tests, save the result.
  2. PlanStories + mini-ADRDraft with AI, correct its assumptions, keep the design small.
  3. Build ×2One feature at a timeBackend, tests, frontend, verify, Break Test.
  4. ProveContract + refactorFull contract and suite, checkpoint, focused refactor, re-run.
  5. SubmitDocs + public branchFive docs files, README note, branch mid-course-project.

Your learning path

Six parts of the brief

Open source guide
01What is assessedTwo small features are the vehicle. The assessment is your AI-assisted process: clear prompts, inspected output, running the app, testing behavior, debugging from evidence and recording what you accepted, edited or rejected.8 min02Choosing featuresPick two features from five core options. Each comes with expected backend work, frontend work and good tests. Three optional extensions exist, but the brief warns they are bigger or easier to overbuild.10 min03Workflow loopBranch and baseline first. Draft stories with AI and correct its assumptions. Write the mini-ADR before coding. Then build each feature as a small loop: backend, tests, frontend, verify, Break Test. Finish with the contract, a checkpoint and one focused refactor.11 min04Tests and Break TestsKeep every existing test and add at least four new pytest tests. Prove at least two of them with a Break Test: pass, break the source on purpose, see the right failure, restore, pass again. Run a behavior contract before and after your refactor.11 min05Five docs filesUser stories, a mini-ADR, a prompt log, verification evidence and a reflection. Concise Markdown, enough detail that another person can follow the task, the constraints, the AI’s response and your decision.10 min06Submission and rubricSubmit a public repository URL with a branch named mid-course-project, your code, all tests plus at least four new ones, docs/midcourse/, a README run note, and nothing secret or unrelated. The result is Met or Not Met against a rubric you must fully meet to continue.9 minWhat you keep from the midcourse projectThe midcourse project is a rehearsal of the whole course loop on a real change: plan with AI, correct it, build in small verified layers, prove your tests, refactor safely and write down every decision.SummaryWorked example: due dates and search, built and evidencedOne student’s real midcourse submission, the author of the repository supplied with this course. It shows how the brief’s requirements turned into stories, decisions, prompts, tests, Break Tests and a reflection. It is evidence of one way to do it well, not the brief, and it goes further than the brief requires.Worked example