What you submit
You submit the repository URL, and the repository must be public. The submitted branch is named mid-course-project. The brief lists what it must include.
- Updated source code for the two selected features.
- All existing tests plus at least 4 new pytest tests.
- docs/midcourse/ with the required documentation files.
- A clear README note or section explaining how to run the backend, open the frontend, and run tests.
- No secrets, credentials, private data, or unrelated generated files.
The README note
The README note is how a reviewer gets your project running. Use the commands you actually ran in this repository: how to install, how to start the backend, how to open or serve the frontend, how to run the full test suite and your new tests. Generic commands copied from somewhere else are a common way to fail this item. Name the two features and point to docs/midcourse/.
Hygiene before you push
Review the final diff as if someone else wrote it. Make sure no Break Test mutation is left in the source, no debug prints or sample data remain, and nothing generated or local is committed: environment files, caches, editor or OS files. A public repository means anything you commit can be read by anyone.
Read with careNever commit API keys, tokens, .env files or private data. Check the staged file list before every commit, not only the last one.
Met or Not Met
This project is a mandatory checkpoint to progress in the course. It is not graded numerically. Your work is evaluated against a predefined rubric aligned with course competencies, and you receive one of two results. You must meet all listed competencies to continue. You will not receive detailed comments or individual feedback.
- Met You demonstrated all required competencies.
- Not Met One or more competencies were not demonstrated. You revise and resubmit.
Read with careThe rubric itself is not in the brief. Treat every requirement the brief names as a competency that could be checked, and do not rely on a reviewer to fill gaps from context.
A self-check before you submit
Walk through the brief one more time against your branch.
- Branch and visibilityPublic repository, branch exactly mid-course-project, final work pushed.
- Two finished featuresBackend, tests, frontend and browser checks for each; at least one visible.
- TestsAll existing tests pass; at least 4 new; Break Tests for at least two, restored.
- Five docs filesComplete, no placeholders, evidence actually observed.
- README and hygieneReal run commands; no secrets or unrelated files.
Course resources each deliverable draws on
Nothing in this project is new. Each deliverable reuses a habit from Modules 1 to 3, and the course pages for those modules are the best place to refresh it before you start.
| Deliverable | Draws on | Where to look |
|---|---|---|
| User stories + corrected assumptions | AI-assisted requirements; prompts as specifications | /ai-assisted-coding/module-1, /ai-assisted-coding/module-1/prompt-library |
| Mini-ADR | A one-paragraph ADR in your own words | /ai-assisted-coding/module-1, /ai-assisted-coding/module-1/reading |
| Prompt log, weak → strong | Prompt patterns and the ask → inspect → run → test → refine loop | /ai-assisted-coding/module-1/prompt-library, /ai-assisted-coding/module-2/prompt-library, /ai-assisted-coding/module-3/prompt-library |
| Backend changes + pytest + Break Tests | Pydantic models, endpoints one at a time, backend rules, pytest, Break Test | /ai-assisted-coding/module-2, /ai-assisted-coding/module-2/prompt-library |
| Frontend + browser checks | Kanban board, modal, DevTools and Network evidence | /ai-assisted-coding/module-3, /ai-assisted-coding/module-3/reading |
| Behavior contract + focused refactor | Contract first, checkpoint, one selected section, diff review | /ai-assisted-coding/module-3, /ai-assisted-coding/module-3/summary |
| Debugging entry + reflection | Debugging log format; reflection log habit | /ai-assisted-coding/module-3/prompt-library, /ai-assisted-coding/resources |
Key takeaways
- Public repository, branch mid-course-project, code, tests, docs/midcourse/, README note.
- At least 4 new pytest tests on top of every existing one.
- No secrets, private data or unrelated generated files; no leftover Break Test mutation.
- Met or Not Met: all competencies must be met; Not Met means revise and resubmit.
- Every deliverable reuses a Module 1-3 habit; refresh it from the course pages.