Two features on the Task Tracker you already have
You use this project after Modules 1, 2 and 3. You start from your existing Task Tracker repository, work in a dedicated branch, and add two scoped features. Each one must be implemented through the full AI-assisted workflow: you plan it, constrain it, implement it in small steps, inspect what the AI gives you, verify it in the app, test it, and document what happened.
Key ideaThis is not a pure software engineering capstone. The Task Tracker is the example. The assessed skill is whether you can use AI to plan, implement, test, refactor and debug a real code change without giving up ownership of the work.
The process is the main assessment
The brief says the software feature matters, but the main assessment is your AI-assisted coding process. It names the habits it is looking for.
- Write clear prompts.
- Inspect AI output instead of pasting it in.
- Run the app.
- Test behavior.
- Debug from evidence.
- Document what you accepted, edited, or rejected.
Small and finished beats big and partial
Each feature should be small enough to complete end-to-end. A polished, verified feature with a strong AI workflow log is better than an ambitious feature that works only partly or cannot be explained. If you cannot explain a piece of code the AI wrote, you do not own it yet, and the brief is checking ownership.
Ambitious and partial
- A large feature, one big AI-generated patch
- Works in the demo path only
- Tests assert status codes, little else
- You cannot explain parts of it
- Thin log of what the AI did
Small and verified
- A scoped feature built in small steps
- Backend, tests and UI each verified
- A Break Test proves a test bites
- Every decision is yours and written down
- A log another person can follow
The brief prefers the right-hand column every time.
At least one feature in the browser
At least one of the two features must be visible and usable in the frontend. In practice the brief expects most students to make both visible: in the Kanban UI, the modal form, filter controls, the card display, or a small supporting panel. A feature that lives only in the API is allowed for one of the two, but it under-uses the Module 3 skills.
Ownership, in practice
Ownership is not a feeling; it shows up as evidence. A baseline test run before you start. A prompt that names the files and the scope. A diff you read before accepting. A test that fails when you break the code on purpose. A log entry that says what you rejected and why. The rest of this project is about producing that evidence as you go, not reconstructing it at the end.
Read with careThe brief does not name a required AI tool. Modules 1 to 3 used browser chat assistants, Cursor and VS Code with Copilot. Use what the course taught you; what matters is the workflow, not the brand.
Key takeaways
- The two features are the vehicle; the AI-assisted workflow is what is assessed.
- Every feature goes through plan, constrain, small steps, inspect, verify, test, document.
- A small, polished, verified feature beats an ambitious partial one.
- At least one feature must be visible and usable in the frontend; aim for both.