AI-Assisted Coding · Module 01
Mindset, Foundations & Prompt Engineering
AI drafts; you specify, inspect, run, test and own the result.
Nine short lessons on the habits behind reliable AI-assisted development: why plausible code can still be wrong, how to write a prompt as a compact specification, and the loop ask, inspect, run, test, refine, applied to Task Tracker requirements, an architecture decision and a running FastAPI skeleton.
- Junior collaborator mindset
- Pattern completion
- Failure modes
- Prompt anatomy
- Prompt patterns
- The interaction loop
- Task Tracker scope
- Context blocks
- Requirements, ADR, scaffold
Module introduction
Start with the habit, not the tool
AI coding assistants are already part of modern software development, so the question this module asks is not whether to use them but how to use them well. You start with a mental model: the assistant completes patterns, it doesn’t run or check your code, and it sounds just as confident when it is wrong. From there you learn to write prompts as specifications, to use three practical patterns, and to run every answer through one loop. Then you use all of it on a deliberately simple Task Tracker, chaining requirements into an architecture decision and that decision into a FastAPI skeleton you have actually seen run.
- Reviewed user stories6–8, with at least one correction
- One-paragraph ADRYour decision, your words
- Running skeleton/health returns 200, /docs opens
- Reflection logRight, corrected, assumed
Every step runs through the loop: ask, inspect, run, test, refine.
Your learning path