AI-Assisted Coding · Module 1Summary

Module summary · 6 min

What you keep from Module 1

Module 1 gives you a stance and a method. The stance: AI is a junior collaborator and you own the result. The method: write the prompt as a specification, run the loop, and let each reviewed output become the next prompt’s context.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

One line per lesson

The nine lessons in a sentence each.

  • 1 · Mindset AI is a junior collaborator; you are the senior developer who owns the result.
  • 2 · How assistants work Pattern completion, not runtime verification. Tone is not evidence.
  • 3 · Prompts as specs Role or context, task, constraints, output format; the first answer is a draft.
  • 4 · Patterns and the loop Role, few-shot, constraints; ask, inspect, run, test, refine.
  • 5 · Task Tracker Simple project, serious workflow; exclusions are part of the spec.
  • 6 · Tools and context The tool changes, the habits don’t; paste your context block first.
  • 7 · Requirements AI removes the blank page; you review, correct and own the stories.
  • 8 · Architecture AI proposes options; your one-paragraph ADR makes the decision.
  • 9 · Scaffold One endpoint you have seen work, and a reflection from your own notes.

Your Module 1 deliverables

Save these before Module 2.

  • 6–8 reviewed user stories with specific acceptance criteria, including at least one scope correction and one edge-case correction.
  • A one-paragraph ADR in your own words: the choice, the four criteria, two rejected AI assumptions and one risk.
  • A running FastAPI skeleton: the server starts, GET /health returns HTTP 200 JSON, and /docs opens.
  • A reflection log: for each activity, one thing AI got right, one correction and one AI assumption.

The chain you built

Habits first, then a scoped project, then three outputs where each one is the next prompt’s context.

From habits to a running skeleton · Study-guide synthesis of Lessons 1-9
  1. Lessons 1-4HabitsMindset, mechanics, specs, loop
  2. Lessons 5-6Scope and contextExclusions and a context block
  3. Lesson 7RequirementsReviewed stories
  4. Lesson 8DecisionYour ADR
  5. Lesson 9Running code/health and /docs

Built from the Module 1 lecture notes, prompt library and additional readings; the videos they accompany were not supplied.

Your study checkpoint

Check what stuck

The practice page puts the module under pressure with realistic situations and a knowledge check.