AI-Assisted Coding · Midcourse projectSummary

Project summary · 6 min

What you keep from the midcourse project

The midcourse project is a rehearsal of the whole course loop on a real change: plan with AI, correct it, build in small verified layers, prove your tests, refactor safely and write down every decision.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

One line per lesson

The six parts of the brief, in one line each.

  • What is assessed The AI-assisted process; the two features are the vehicle.
  • Choosing features Two of five core options; small, visible, testable.
  • Workflow loop Baseline, stories, mini-ADR, then backend → tests → frontend → verify → Break Test per feature.
  • Tests and Break Tests At least 4 new tests; at least two proven by a Break Test; contract before and after refactor.
  • Five docs files Stories, mini-ADR, prompt log, verification, reflection, in docs/midcourse/.
  • Submission Public repo, branch mid-course-project, README note, no secrets; Met or Not Met.

Deliverables checklist

Everything the brief asks you to hand in.

  • Source code for two end-to-end features, at least one visible in the frontend.
  • All existing tests plus at least 4 new pytest tests, all passing.
  • Break Test evidence for at least two tests, with the source restored.
  • user-stories.md: 3-5 stories per feature, acceptance criteria, a corrected AI assumption per feature.
  • mini-adr.md: decisions, AI alternatives, what you rejected.
  • prompt-log.md: at least 3 prompts per feature, one weak → strong rewrite, a decision per prompt.
  • verification.md: baseline, test results, browser checks, contract before/after, Break Tests.
  • reflection.md: 250-500 words.
  • A README note on running the backend, frontend and tests.
  • A public repository, branch mid-course-project, with nothing secret or unrelated.

The chain

Each step produces the evidence the next one relies on.

From baseline to submission · Study-guide synthesis of Lessons 1-6
  1. BaselineProof of the starting state.
  2. Stories + ADRCorrected AI assumptions.
  3. Feature loopsVerified layers, Break Tests.
  4. Contract + refactorBehavior unchanged.
  5. Docs + submitDecisions on the record.

From the midcourse project brief (4 pages), with links back to the Module 1-3 habits it reuses.

Your study checkpoint

Check what stuck

The practice page puts the project under pressure with realistic situations and a knowledge check.