AI-Assisted Coding · Module 4 · Reading

Further reading

The course's own curated list for this module, with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.

Before you click

This is the library’s caveat, not the PDF’s: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.

Core readings

Read these after the lecture. The list calls them the minimum supporting readings, mapped directly to the Module 4 demos, and estimates about 60 to 75 minutes in total if you read only the sections noted. Its rule for every source: when documentation and tutorials disagree with your repo, trust the repo and verify — read the diff, run the command, check the output, and refine.

  1. Anthropic — Claude Code overview (opens in a new tab)

    Why the module reaches for a terminal agent rather than only autocomplete or editor chat.

    Read this part Read the overview sections on understanding a whole repo, working across several files and using tools. Skip the product-marketing detail and anything the Task Tracker repo does not need.

  2. Anthropic — How Claude remembers your project (opens in a new tab)

    The main supporting reading for CLAUDE.md and project memory.

    Read this part Focus on CLAUDE.md files: what goes in them, when to update them, and what to do when Claude does not follow the instructions. Skip organization-wide memory and the advanced auto-memory detail unless it helps.

  3. Docker Docs — Building best practices (opens in a new tab)

    The main source for why a Dockerfile has to be more than merely buildable.

    Read this part Focus on multi-stage builds, excluding files with .dockerignore, keeping images small, and the USER / non-root guidance. Skip the build-cloud and supply-chain sections for this module.

  4. GitHub Docs — Responsible use of AI code review (opens in a new tab)

    Reinforces that AI review supplements human review rather than replacing it. The link itself is GitHub’s page on responsible use of Copilot code review.

    Read this part Focus on the limitations: missed issues, false positives, inaccurate suggestions, and the requirement to review and test before you act.

Practical references

Keep these open while you work in the Task Tracker repo and diagnose problems. The list says they are lookup references, not sit-and-read assignments.

  1. Anthropic — Claude Code common workflows (opens in a new tab)

    Use it while practising everyday Claude Code workflows: exploring code, planning before editing, testing and documentation tasks.

    Read this part Focus on the prompt recipes and the plan-before-editing guidance. Skip subagents, parallel sessions and CI automation unless you are doing an optional extension.

  2. Anthropic — Claude Code best practices (opens in a new tab)

    A lookup reference for when Claude Code output starts drifting or you need a safer workflow.

    Read this part Focus on environment setup, planning, reviewing diffs and keeping context useful. Leave the advanced scaling patterns until after the core module.

  3. GitHub Docs — Workflow syntax for GitHub Actions (opens in a new tab)

    Use it when reading or editing .github/workflows/ci.yml.

    Read this part Look up on, jobs, steps, runs-on, uses, run and matrix only as you need them. Do not try to read the whole reference end to end.

  4. Docker Docs — Multi-stage builds (opens in a new tab)

    Use it when reviewing a generated Dockerfile that has a builder stage and a runtime stage.

    Read this part Focus on multiple FROM statements and COPY --from. Adapt the examples to the Task Tracker FastAPI app rather than copying them blindly.

  5. Docker Docs — Build context and .dockerignore (opens in a new tab)

    Companion: Dockerfile reference — .dockerignore and USER (opens in a new tab)

    Use it to check whether .env, .git, venv, build artifacts or other unneeded files are getting into the Docker build context.

    Read this part Focus on how .dockerignore matching works and how the build context is sent to Docker. Keep it open while you review the COPY lines.

Optional deeper dives

Two kinds of extra reading. The four deeper dives are useful but not needed for the quiz or the deliverables; read them after the core and practical items. The two extension items cover ideas next to Module 4 that the slides and recordings do not teach; use them only after the core module work is finished.

  1. HumanLayer — Writing a good CLAUDE.md (opens in a new tab)

    A practitioner’s view of what makes a CLAUDE.md useful instead of bloated.

    Read this part Read selectively for structure and examples, and do not copy the examples blindly into the Task Tracker repo.

  2. Anthropic — Bringing Code Review to Claude Code (opens in a new tab)

    Where Claude Code review was heading as a product feature at the time the list was written.

    Read this part Read for context only. The module still teaches AI review as triage: Useful, Noise, Wrong.

  3. adr.github.io — Architectural Decision Records hub (opens in a new tab)

    Background on architectural decision records, decision logs and templates.

    Read this part Read the overview and the template links only. Do not overcomplicate the Module 4 technical note.

  4. AWS — ADR best practices (opens in a new tab)

    A more team-oriented view of decision records: ADR meetings, ownership and decision quality.

    Read this part Read selectively, and skip the organization and process sections that are too heavy for a small course repo.

  5. Extension · GitHub Docs — Security for GitHub Actions (opens in a new tab)

    A roadmap of Actions security topics such as artifact attestations and OIDC, most of it beyond the Task Tracker’s CI workflow.

    Read this part Skim the overview only. The list adds that it does not replace the required checks: exact Python version, no swallowed failures, an intentional red run and a restored green run.

  6. Extension · Anthropic Engineering — Claude Code auto mode (opens in a new tab)

    For the curious: permissions and automation beyond the basic permission prompts shown in the module.

    Read this part Read for the concept only. The course baseline stays conservative: inspect, approve deliberately, and verify.

Where each one helps

Readings, mapped to the lessons.

Which reading supports which lesson · Readings pp. 1-5
ReadingSupports
Core 1 · Claude Code overview1 · The delivery layer (why a terminal agent); 2 · Claude Code in the terminal
Core 2 · How Claude remembers your project2 · Claude Code in the terminal (CLAUDE.md)
Core 3 · Docker building best practices4 · Containerize the Task Tracker
Core 4 · Responsible use of AI code review6 · AI-assisted code review
Practical 1-2 · Claude Code workflows and best practices2 · Claude Code in the terminal (plan mode, reviewing diffs); 5 · Verified documentation
Practical 3 · Workflow syntax for GitHub Actions3 · The CI pipeline
Practical 4-5 · Multi-stage builds; build context and .dockerignore4 · Containerize the Task Tracker
Optional 1 · Writing a good CLAUDE.md2 · Claude Code in the terminal
Optional 2 · Bringing Code Review to Claude Code6 · AI-assisted code review
Optional 3-4 · ADR hub; ADR best practices7 · The technical note
Extension 1-2 · Actions security; Claude Code auto mode3 · The CI pipeline; 2 · Claude Code in the terminal (permissions)

Read with careThe readings PDF does not print its own map; this one is built from each item’s stated purpose.

Back to the lessons Every course resource