AI-Assisted Coding · Module 4Summary

Module summary · 8 min

What you keep from Module 4

Module 4 added no features. It gave the Task Tracker project memory, a CI pipeline that is proved to fail, a safer container, documentation checked against the code, a triaged AI review and a decision note in your voice, each backed by evidence.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

One line per lesson

The seven lessons, each in a sentence.

  • 1 · The delivery layer Delivery artifacts can look right while being wrong; match the AI surface to the scope.
  • 2 · Claude Code setup Correct CLAUDE.md by hand and verify answers against the code.
  • 3 · CI pipeline A green check only matters if failure turns it red.
  • 4 · Containerize Multi-stage, slim, non-root, no secrets, proved with /health and whoami.
  • 5 · Verified documentation Fluent prose is not evidence; log claim versus reality.
  • 6 · AI review Triage every comment into Useful, Noise or Wrong; act on Useful only.
  • 7 · Technical note Claude drafts. You own the voice.

Deliverables with evidence

The module’s outputs, as a final check.

  • Claude Code set up in the right repo, CLAUDE.md committed, two answers verified.
  • .github/workflows/ci.yml with green → red → green evidence.
  • Multi-stage Dockerfile and .dockerignore with build, run, /health and whoami evidence.
  • Three-line Docker security log.
  • Docstrings and README plus a claim-vs-reality log.
  • Annotated review log: every comment Useful, Noise or Wrong, with a reason.
  • docs/decisions/<short-name>.md linked from README, plus the tool-fit reflection.

How the artifacts chain together

Each artifact is something a later step can inspect. CLAUDE.md gives the agent the facts the CI and Docker prompts rely on; the CI and Docker files are what the README documents; any of those diffs can be the one you review; and the decision note explains the choices behind them.

Each artifact feeds the next · Study-guide synthesis of Lessons 1-7
  1. CLAUDE.mdproject facts
  2. ci.ymlproved red
  3. Dockerfilenon-root, /health
  4. Docsclaims checked
  5. Review logtriaged
  6. Decision notethe why

Built from the Module 4 lecture notes, prompt library and additional readings; page references are to the supplied PDFs.

Your study checkpoint

Check what stuck

The practice page puts the module under pressure with realistic situations and a knowledge check.