Where each part comes from, what was not supplied, and the places where the material needs a careful reading.
The sources
Built from the end-of-course project brief, endofcourseproject.pdf (2 pages): purpose, a pointer to the detailed instructions, submission, platform steps, grading and facilitator feedback. The detailed instructions are in a separate downloadable assignment file the brief links to; that file was not supplied, so the list of required docs/ files, any templates and the rubric’s competencies are unknown here. Where the lessons explain how to meet a requirement, they draw on the Module 1-5 lecture notes, which taught each practice, and say so. The worked example is one student’s submission: the author’s own final-project repository, with their identity, repository URL, CI run links and commit identifiers left out. The brief has no prompt library and no readings.
Listening
Every page in this course is read aloud by your device’s own voice. No recorded narration was generated for it. Back to the project →
Lessons and their sources
Lesson
Source
1 · What a teammate-maintainable release means
Project brief p. 1; Module 1 notes pp. 1-3; Module 4 notes pp. 1-3; Module 5 notes pp. 2-3
2 · What the branch must contain
Project brief p. 1; Module 2 notes pp. 10-11; Module 4 notes pp. 3, 6-11; Module 5 notes p. 4
3 · Secrets and data hygiene
Project brief p. 1; Module 4 notes pp. 9-10; Module 5 notes pp. 9-10
4 · Evidence-backed documents
Project brief p. 1; Module 4 notes pp. 8, 10-12; Module 5 notes pp. 7-8
5 · Proving you own the result
Project brief p. 1; Module 5 notes pp. 2-3, 10, 18-20
6 · Submission and the Met / Not Met rubric
Project brief pp. 1-2
7 · Course resources for this project
Each module’s prompt library and reading list
Worked example
The author’s final-project repository (one student’s submission)
Part 01
What a teammate-maintainable release means
The final project is a release, not a sprint. You keep the product exactly as it is and make it something another person can run, test, trust and change, with AI doing drafting and review under your control.
The purpose line, the no-new-features rule and the five verbs are quoted from the brief.
Project brief p. 1
The missing assignment file
The Instructions section links a downloadable assignment file that was not supplied.
Project brief p. 1
Grade, do not accept
Module 5 opens with two rules: grade, do not accept, and the deliverable lives in docs/; unexpected app/ edits are rejected.
Module 5 lecture notes pp. 2-3
Junior collaborator mindset
AI as junior collaborator and the ask, inspect, run, test, refine loop.
Module 1 lecture notes pp. 1-3
Module 4’s engineering layer
Module 4 frames CI, Docker, documentation and review as the layer around the existing app.
Module 4 lecture notes pp. 1-3
Part 02
What the branch must contain
The brief lists what the final-project branch must contain. Each item is something a module already taught you to build and verify; this lesson connects each one to its module and to the check that makes it trustworthy.
The branch contents list and the final-project branch name.
Project brief p. 1
CI expectations and red flags
Workflow shape, red flags and the green-red-green proof.
Module 4 lecture notes pp. 7-9
Docker requirements
Multi-stage, slim base, non-root, no baked secrets, no reload, /health and whoami checks.
Module 4 lecture notes pp. 9-10
README and documentation verification
README must match the repository; follow commands from a clean mental model.
Module 4 lecture notes pp. 10-11
AGENTS.md
What AGENTS.md should contain: stack and commands, project rules, boundaries, review expectations.
Module 5 lecture notes p. 4
Break Test
Deliberately break production code to prove tests protect behavior.
Module 2 lecture notes pp. 10-11
Part 03
Secrets and data hygiene
A public repository is a permanent publication. The brief asks you to confirm it holds no secrets, tokens, .env files, credentials, production logs or personal and customer data. This lesson turns that sentence into checks you can run.
The .dockerignore as part of the security story and what it should exclude.
Module 4 lecture notes p. 9
Docker security log
Non-root user, slim base, no baked secrets.
Module 4 lecture notes pp. 3, 10
Governance lenses and risk levels
What I shared, what I received, what pattern changes; Low, Medium, High.
Module 5 lecture notes pp. 9-10
Never-paste rule
A strong rule names specific data types: .env files, secrets, credentials, tokens, real customer data.
Module 5 lecture notes pp. 10, 19
Part 04
Evidence-backed documents
The brief asks for “evidence-backed documents in docs”. Evidence is something a reader can check: a command and its observed result, a file and line, a run and the commit it ran on. This lesson shows what that looks like and how to keep it honest.
The brief ends its purpose with “proving that you own the final result.” Ownership is not a signature. It is being able to explain what AI produced, show how you checked it, and defend every decision, including the ones where you said no.
The purpose line ends with proving that you own the final result.
Project brief p. 1
Grading posture
Can I explain and defend the final artifact? Building versus grading posture.
Module 5 lecture notes pp. 2-3
Line-by-line trace
Trace one generated block; mark any line you cannot explain.
Module 5 lecture notes p. 10
Personal AI playbook
Playbook sections, the Decision Card, evidence-backed rather than aspirational.
Module 5 lecture notes pp. 18-19
Tool arc
AI generates, suggests, explains and reviews; the developer inspects, verifies, rejects, revises and owns.
Module 5 lecture notes p. 20
Part 06
Submission and the Met / Not Met rubric
You push the final-project branch to the same public repository, confirm its contents and hygiene, and submit only the repository URL. The result is Met or Not Met against a rubric of course competencies, with no detailed feedback.
Push, confirm contents, confirm hygiene, submit only the URL.
Project brief p. 1
Platform steps
Add Submission, upload under Attachment, Save Changes.
Project brief p. 1
Grading
Mandatory checkpoint, not numeric; all competencies must be met; Met or Not Met.
Project brief p. 1
Facilitator feedback
Rubric aligned with course competencies; no detailed comments; Not Met requires revise and resubmit.
Project brief pp. 1-2
Part 07
Course resources for this project
The final project draws on everything the course taught. This closing part points you to each module’s prompt library and reading list, and says what to reuse from each for the release.
The brief says the detailed instructions are in a downloadable assignment file. It was not supplied. These pages never present an inferred requirement as the brief’s.
The required docs/ files are not named
The brief requires “the required docs/ files” but does not list them. The Module 4 and 5 documents and the author’s three release documents are shown as context only.
The rubric’s competencies are not named
Grading is against “a predefined rubric aligned with course competencies”, which the brief does not list.
URL or attachment?
The brief says to submit only the public repository URL, then gives generic platform steps about uploading a file under Attachment. The study guide reads the URL as the content to submit.
docs/ versus Docs/
The brief and Module 5 notes say docs/; the author’s repository tracks Docs/. On case-sensitive systems these are different paths, which one of the author’s own review findings caught in README links.
One student’s choices
The worked example’s scope list, deliverable list and document set are the author’s, written with access to the assignment file this material lacks. They illustrate one approach.
The author’s evidence drifted
Some sections of the author’s release evidence and ownership statement were not updated after the late explicit-null fix, and CLAUDE.md still names the Module 5 branch. The worked example points these out as lessons.
Two grades for one issue
Missing authentication is graded Valid in the author’s Module 5 security review and Noise as a security finding in the final AI review, each with a reason.
Dated tool and version details
The author’s documents name the AI tool and model they used in July 2026, and the Module 4 demo uses Python 3.11 while the author’s project targets 3.9. Treat tool details as dated to those documents.
The outcome is not recorded
The author’s test file calls the explicit-null defect “reviewer-reported”. Whether an earlier submission was graded Not Met is not recorded, and nothing about the result is claimed.
Checked against the supplied documents cited in each note.
What not to take away
The lessons actively work against these misreadings:
The final project is a chance to add one last feature.
A green CI badge proves the tests ran and can fail.
A Docker image that builds is ready to ship.
If AI wrote the evidence document, it counts as evidence.
NOT RUN looks bad, so mark a check PASS if it probably works.
Deleting a secret in a later commit removes it from a public repository.
An empty You-only column means the security review failed.
Every Valid finding must be fixed before release.
The ownership statement is a formality that never needs updating.
The brief lists every docs/ file you need.
Study-guide synthesis; each item is addressed in the parts.