AI-Assisted Coding · Final projectPart 4

Study explanation · Part 04 · 15 min

Evidence-backed documents

The brief asks for “evidence-backed documents in docs”. Evidence is something a reader can check: a command and its observed result, a file and line, a run and the commit it ran on. This lesson shows what that looks like and how to keep it honest.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

What counts as evidence

Module 4 put it bluntly: the most dangerous documentation is the documentation that sounds right. Fluent prose is not evidence. An evidence-backed sentence names what was checked, how, and what was observed, so a teammate could repeat it and get the same answer.

A fluent claim versus an evidence-backed one · Study-guide synthesis of Module 4 notes pp. 10-11

Sounds right

  • “Tests pass.”
  • “CI is set up.”
  • “The container is secure.”
  • “The README is accurate.”

Can be checked

  • Command, count passed, failed, skipped, Python version.
  • Workflow file, triggers, the run’s result and the commit it ran on.
  • Build, run, /health status, whoami output, .dockerignore contents.
  • Each claim, how it was checked, actual result, fix made.

Evidence is what lets someone else repeat your check and reach the same conclusion.

PASS only when observed

The course has been consistent about status words. A check is PASS only when you ran it or personally observed it. A check you did not run is NOT RUN. A check that needs a human step you have not done, such as clicking through the board in a browser, is NEEDS OWNER VALIDATION with the exact steps. Never upgrade NOT RUN to PASS because it probably works. A teammate trusts the PASS lines only if the NOT RUN lines are honest.

Key ideaAn honest NOT RUN is stronger evidence of a trustworthy process than a PASS nobody observed.

Tie every result to a commit

A CI result is evidence about one commit. If you later push a fix, the earlier green run says nothing about the new code. Record which commit a test run, CI run or container check refers to, and when a later change supersedes it, update every place the old result is quoted. Writing an evidence document is itself a commit, so the branch head will move past the commit you validated; say which commit is the validated one.

Read with careEvidence goes stale silently. Before submitting, reread every evidence document top to bottom and check that counts, dates and conclusions agree with each other and with the final commit.

The claim-vs-reality log

Module 4 introduced the claim-vs-reality log for documentation: what AI (or an old document) claimed, what the code actually does, and how you resolved it. The same shape works for a release: list each claim the README and AGENTS.md make, the evidence used to check it, the actual result, whether it was accurate, and what you changed.

Claim vs. reality, example rows · Module 4 lecture notes p. 11
AI claimedCode actually doesResolution
POST /tasks returns 200.The route returns 201 Created.Update the docstring/README to say 201.
DELETE returns a JSON object.The route returns 204 No Content.Remove the invented response body from the docs.
Status can move freely between all states.The model or service enforces specific allowed transitions.Rewrite the status-rule explanation to match the actual code.

Read with careThe notes say these rows show the kind of mismatch to look for; your log should record the real inaccuracies in your own repository.

Evidence for CI and the container

Module 4 already defined the strongest evidence for the two release files most likely to look right while being wrong.

  • CI: the workflow file, its triggers, the Python version, the install and test commands, a scan for red flags, and green, then deliberate red, then green again, with the number of tests collected so a zero-test success cannot hide.
  • Container: the build command and result, the run command, the /health status and body, the whoami or id output showing a non-root user, the absence of a reload flag, and what the .dockerignore keeps out.

Review evidence: AI proposes, you grade

Review documents need two layers of evidence: what the AI said, and what you decided after checking it. Module 4’s review log sorts every AI review comment into Useful, Noise or Wrong, with a short justification. Module 5’s security review grades every finding Valid, False Positive or Noise, reconciles AI findings with your own manual scan in Agreement, AI-only and You-only columns, and ranks a top-three backlog of Valid findings with next actions. Keep the AI’s suggested grade and your final grade visibly separate until you have checked the evidence.

Review buckets · Module 4 lecture notes p. 12
BucketDefinitionAction
UsefulA real bug, risk, missing test, misleading doc, or maintainability issue.Verify it, then fix or create a follow-up task.
NoiseTechnically fine but not worth acting on, such as a style preference outside team conventions.Skip it and record why.
WrongMisreads the code, invents a problem, or ignores context in another file.Do not fix the imaginary issue. Record the misunderstanding.

Key takeaways

  • Evidence is a check someone else can repeat: command, file, run, commit, observed result.
  • PASS only when observed; NOT RUN and NEEDS OWNER VALIDATION are honest, useful states.
  • Tie each result to a commit and update every quote when a later change supersedes it.
  • Keep the AI’s grade and your grade separate until you have checked the evidence.

From the end-of-course project brief and the Module 1-5 lecture notes; the detailed assignment file was not supplied.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Part 5