AI-Assisted Coding · Final project reference
Glossary
Short definitions as the project uses them, each linked to the part it comes from.
- Teammate-maintainable release
A version of the project another person can clone, run, test, trust and change from its own documentation and evidence.
Review Part 1- Product feature
New user-visible behavior. The brief rules these out for the final project.
Review Part 1- Harden
Make the existing project safer or more robust through small, verified changes, not new capabilities.
Review Part 1- Assignment file
The separate downloadable instructions the brief refers to; not supplied with this course material.
Review Part 1- final-project branch
The branch the brief asks you to push to the same public repository used for the course project.
Review Part 2- AGENTS.md
A repo-level instruction file for AI agents: stack, commands, project rules, boundaries and review expectations.
Review Part 2- CLAUDE.md
Claude Code’s project-memory file, introduced in Module 4; it can defer to AGENTS.md.
Review Part 2- CI workflow
The .github/workflows/ci.yml file that runs the test suite automatically on push and pull request.
Review Part 2- Green-red-green
Module 4’s CI proof: a passing run, a deliberately failing run, then passing again without hiding the failure.
Review Part 2- Multi-stage build
A Dockerfile with a builder stage for dependencies and a slim runtime stage that copies only what the app needs.
Review Part 2- Non-root user
A container user without root privileges, checked with whoami or id inside the running container.
Review Part 2- Break Test
Deliberately breaking production code to confirm the matching test fails, then restoring it.
Review Part 2- .dockerignore
The list of paths kept out of the Docker build context, such as .env, .git, virtual environments and caches.
Review Part 3- Repository history
Every commit ever pushed. A file deleted later is still in history and still public.
Review Part 3- Secret rotation
Replacing an exposed credential with a new one so the leaked value stops working.
Review Part 3- Risk level
Module 5’s Low, Medium or High classification for what you shared with an AI tool.
Review Part 3- Evidence-backed document
A document whose claims each name what was checked, how, and what was observed, so someone else could repeat it.
Review Part 4- NOT RUN
An honest status for a check that was not performed; never to be upgraded to PASS without observation.
Review Part 4- NEEDS OWNER VALIDATION
A status for a check that needs a human step, recorded with the exact steps to perform.
Review Part 4- Claim-vs-reality log
A table of what documentation claimed, what the code actually does, and how the mismatch was resolved.
Review Part 4- Useful, Noise, Wrong
Module 4’s buckets for AI code-review comments.
Review Part 4- Valid, False Positive, Noise
Module 5’s grades for AI security findings.
Review Part 4- Line-by-line trace
An explanation of each line of a generated block: what it does, why it exists, what breaks without it.
Review Part 5- Backlog item
A recorded Valid finding not fixed now, with an owner, next action and how completion will be verified.
Review Part 5- Ownership statement
A short first-person account of what AI did, what you verified and decided, and what remains open; it must match the evidence.
Review Part 5- Decision Card
The part of the Module 5 playbook naming your tool and checks for features, review, debugging, infrastructure, never-paste and one rule.
Review Part 5- Met / Not Met
The project’s result: all required competencies demonstrated, or one or more not, requiring revise and resubmit.
Review Part 6- Mandatory checkpoint
The brief’s description of the project: not graded numerically, but required to progress in the course.
Review Part 6- Prompt library
Each module’s collection of weak and improved prompts, reusable for release tasks.
Review Part 7