AI-Assisted Coding · Final projectPart 7

Study explanation · Part 07 · 8 min

Course resources for this project

The final project draws on everything the course taught. This closing part points you to each module’s prompt library and reading list, and says what to reuse from each for the release.

Listen to this lesson

Hear the lesson read aloud, with each sentence highlighted as you go.

Narrated by an AI voice.

Course resources for this project

Every module’s prompt library and reading list stays useful for the release. The course resources page gathers them in one place. The sections below say what to reuse from each module. Module 2 has no reading list; the other modules do.

Module 1: prompts as specifications

Reuse the structured prompt shape (role and context, task, constraints, output format) whenever you ask AI to draft a release file, and the ask, inspect, run, test, refine loop for every check. Module 1’s ADR habit, naming rejected alternatives and one risk, is the model for any decision note. Its reading list is at /ai-assisted-coding/module-1/reading.

Module 2: tests that can fail

Reuse the test-generation and Break Test prompts when you add regression tests for a security fix, and the list of common AI mistakes in generated tests when you review them. Module 2 has no separate reading list.

Module 3: the browser is evidence

Reuse the behavior-contract and debugging prompts when you check that the board still works before release. Some defects only appear in a real browser; record that check as observed or NOT RUN. Its reading list is at /ai-assisted-coding/module-3/reading.

Midcourse project: a scoped change, documented

The midcourse project practiced the full workflow on two features, with a prompt log, verification and Break Test evidence and a reflection. The same documentation habits carry into the release, applied to hardening rather than features.

Module 4: CI, Docker, docs and review

This is the module the release leans on most. Reuse its prompts for CLAUDE.md or AGENTS.md project memory, the CI workflow and its green-red-green proof, the Dockerfile and .dockerignore, documentation with a claim-vs-reality log, AI code review sorted into Useful, Noise and Wrong, and a decision note. Its reading list is at /ai-assisted-coding/module-4/reading.

Module 5: security, governance and the playbook

Reuse its AGENTS.md, read-only security review, governance worksheet, line-by-line trace and playbook prompts. Grading every finding Valid, False Positive or Noise, and keeping rules testable by a teammate, are the habits the release documents depend on. Its reading list is at /ai-assisted-coding/module-5/reading.

Key takeaways

  • Each module’s prompt library already holds prompts for most release tasks.
  • Module 4 covers CI, Docker, docs and review; Module 5 covers AGENTS.md, security, governance and the playbook.
  • The course resources page gathers every library and reading list.

From the end-of-course project brief and the Module 1-5 lecture notes; the detailed assignment file was not supplied.

Your study checkpoint

Ready to continue?

Mark the lesson complete once you have read it and tried its idea on something real.

Next · Summary