The four submission bullets
The brief’s Submission section has four bullets. Read them as a sequence.
- Push the final-project branch to the same public GitHub repository used for the course project.
- Confirm the branch contains README.md, AGENTS.md, CI, Docker files, app/, frontend/, tests/, and the required docs/ files.
- Confirm the repo contains no real secrets, tokens, .env files, credentials, production logs, or personal/customer data.
- Submit only the public GitHub repository URL.
- Pushfinal-project branch, same public repo
- Confirm contentsEvery listed item present
- Confirm hygieneNo secrets, logs or real data
- Submit URLOnly the public repository URL
How the platform step reads
The brief then gives three platform steps: click Add Submission, upload your file under Attachment, and click Save Changes. These sit oddly beside “Submit only the public GitHub repository URL”; they read like the platform’s standard wording. Whatever field the platform offers, what you submit is the URL. Check that the repository really is public by opening the URL in a signed-out browser window, and that the branch name is exactly final-project.
Read with careThe study guide’s reading of an unclear pair of instructions. If the course platform says otherwise, follow it.
Met or Not Met
The project is “a mandatory checkpoint to progress in the course. It is not graded numerically.” Work is evaluated on whether you demonstrated the required competencies, using a predefined rubric aligned with course competencies. You must meet all listed competencies to continue. The result is Met, meaning you demonstrated all required competencies, or Not Met, meaning one or more were not demonstrated and you will be required to revise and resubmit. You will not receive detailed comments or individual feedback.
Key ideaWith no detailed feedback, your own evidence documents are the only explanation a reviewer gets. Make them easy to check.
Read with careThe brief does not name the competencies. They are presumably in the missing assignment file; these pages do not guess them.
A final pre-submission pass
Because Not Met comes without detail, it pays to review your own branch as a strict stranger would, right before you submit. This checklist is the study guide’s, assembled from the brief and the module checks.
- The URL opens while signed out, and the final-project branch is visible.
- Every item in the brief’s list is present at the expected path, with the casing your README and AGENTS.md use.
- A fresh clone, following README.md only, installs, runs the backend and frontend, and passes the tests.
- The latest CI run is green for the commit you are submitting, and it collected the full suite.
- The container builds, runs as a non-root user and answers /health with 200.
- No new product feature was added; any app/ change is a small, explained, tested fix.
- Tree and history contain no secrets, .env files, credentials, production logs or real personal data.
- Evidence documents agree with each other and with the final commit: counts, dates, conclusions, ownership statement.
If the result is Not Met
Revise and resubmit. Start from your own evidence: reread the brief, the assignment file if you have it, and your documents, looking for any claim that a reviewer could not confirm. A missing item, a broken command, a stale count or a check marked PASS that was never run are the kinds of gap that are easy to miss from the inside. Fix the gap, re-run the affected checks, update the evidence and the ownership statement, and push again to the same branch.
Key takeaways
- Push final-project to the same public repository and submit only its URL.
- Confirm both contents and hygiene before submitting.
- Met means every required competency was demonstrated; Not Met means revise and resubmit.
- There is no detailed feedback, so your evidence must explain itself.