The brief in one sentence
The brief’s purpose line is: “Turn the Task Tracker you built across the course into a teammate-maintainable release.” It then rules out the obvious temptation: “You are not adding product features.” Instead you use AI “to harden, verify, document, review, and govern the project, then” prove “that you own the final result.” The submission is a public GitHub repository and “a set of evidence-backed documents in docs.”
Key ideaTeammate-maintainable means a person who was not in your head while you built it can clone the branch, follow the README, run the tests, trust the CI result, start the container and understand why things are the way they are.
Why no new features
Every module so far added something: a skeleton, CRUD and rules, a frontend, due dates and search, CI and a container, a reviewed plan for comments. The final project is deliberately the opposite. A release-hardening exercise is judged by what did not change as much as by what did. New features would add untested surface, blur the evidence, and make it impossible to show that the existing behavior still holds. Module 5 already set the posture: the deliverable lives in docs/, and unexpected app/ edits are rejected unless a small fix is explicitly allowed.
- Out of scope by the brief: any new product feature.
- Out of scope by the same logic: authentication, a database, notifications, comments, a framework migration, a broad redesign or mass reformatting.
- In scope: missing release files, documentation corrections, CI and Docker fixes, and a minimal verified bug or security fix if your evidence shows one is needed.
Read with careThe second and third bullets are the study guide’s reading of “not adding product features”, matched to how Module 5 scoped its work. The brief itself names only the rule, not a list. The author’s worked example writes the same split into its AGENTS.md.
The five verbs on the Task Tracker
Each verb in the brief maps onto something you already practiced. Read them as questions a teammate would ask.
- Harden Is anything fragile or unsafe that a small, verified change should fix before release? Module 5’s security review is where you found out.
- Verify Do the tests, CI, container and the board in a real browser actually do what the docs claim? Module 4’s green-red-green and /health checks.
- Document Can a newcomer run the project from README.md alone, and can an AI tool work safely from AGENTS.md alone? Modules 4 and 5.
- Review Has AI reviewed the release diff, and have you graded every comment against the code? Module 4’s review log, Module 5’s grading.
- Govern Is the repository free of secrets and real data, and do you have written rules for how you use AI? Module 5’s governance retrospective.
The course arc this release closes
The Task Tracker grew one layer per module. The final project does not add a layer; it checks every layer still holds and leaves a record a teammate can trust.
- Module 1 · SkeletonRequirements, an ADR, a running FastAPI /health.
- Module 2 · BackendPydantic models, CRUD, status rules, pytest and Break Tests.
- Module 3 · FrontendKanban board, behavior contract, safe refactor, debugging.
- Midcourse · Two featuresScoped features through the full AI workflow.
- Module 4 · Engineering layerProject memory, CI, Docker, verified docs, review.
- Module 5 · Grading AIAGENTS.md, security review, governance, playbook.
- Final · ReleaseNo new layer. Prove every layer holds.
What the supplied material does not tell you
The brief’s Instructions section says: “Kindly download the instructions of the assignment and answer the problems (by clicking on the word assignment).” That linked assignment file was not supplied with this course material. So the exact list of “required docs/ files”, any templates, any page limits and the rubric’s named competencies are unknown here. These pages fill the gap only from the lecture notes of Modules 1 to 5, which taught each practice, and from one student’s submission, and they label which is which.
Read with careIf you have access to the course platform, download the assignment file and treat it as the authority. Where it and these pages differ, the assignment file wins.
The mindset carried from Module 1
Module 1 set the course mindset: AI is a junior collaborator, and you are the senior developer who reviews, tests, corrects and owns the result. The loop is ask, inspect, run, test, refine. Module 5 sharpened it into “grade, do not accept”. The final project is where both are tested at once: AI can draft the CI file, the Dockerfile and every document, but nothing counts until you have run it, checked it and can defend it.
Key ideaAI proposes; you verify and decide. The release is the record that you did.
Key takeaways
- The brief’s purpose: a teammate-maintainable release, with no new product features.
- Five verbs (harden, verify, document, review, govern) plus proof of ownership.
- The detailed assignment file was not supplied; inferred details are labelled as such.
- The release checks every earlier layer still holds rather than adding a new one.