AI-Assisted Coding · Module 5 · Reading
Further reading
The course's own curated list for this module, with what each source is for and which part of it to read. Every link is the module's recommendation, not this library's.
This caveat is the library’s, not the PDF’s: web pages move and get renamed over time, so if a link doesn’t resolve, search the title in quotes — the resource is usually easy to find under the same name. Links open in a new tab. They were taken from the supplied reading list and have not been assessed here.
Core readings
Read these after the lecture. The list calls them the minimum supporting readings for Module 5 and estimates about 55 to 70 minutes in total if you read only the listed sections. Read selectively: each item’s “read this part” line tells you which section matters, so you do not have to read a whole standard or a long research paper.
OpenAI — Codex app (opens in a new tab)
The official reference for the desktop app surface the module teaches: choosing a project folder, working in threads, and staying grounded in the real repository instead of a generic chat.
Read this part Read the overview of the app as a command center, plus project threads, worktrees and the Git features. Skip the CLI, IDE extension, automations and advanced integrations for this module.
OpenAI — Custom instructions with AGENTS.md (opens in a new tab)
Why the module writes AGENTS.md before it asks Codex to review, plan or document anything in the repo.
Read this part Read what AGENTS.md is, how Codex reads it, and what belongs in project guidance: stack, commands, testing expectations, security notes and path boundaries.
OpenSSF — Security-Focused Guide for AI Code Assistant Instructions (opens in a new tab)
Backs up the module’s security posture: AI can assist, but the developer stays responsible for reviewing and editing what it generates.
Read this part Read the opening principles and the guidance on security-focused instructions. Keep it beside the security review, the governance retrospective and your personal AI usage rules.
OWASP — Secure Code Review Cheat Sheet (opens in a new tab)
Support for the manual scan you run after Codex produces its audit: concrete review lenses that go beyond a generic “is this secure?”
Read this part Focus on security-focused review, input validation, authentication, authorization, error handling, logging, data exposure and attack vectors, then translate the checklist into Task Tracker questions.
Martin Fowler / Thoughtworks — Context Engineering for Coding Agents (opens in a new tab)
The list calls this the most directly relevant practitioner reading for the context engineering activity.
Read this part Read about context engineering for coding agents, reusable instructions, files as context, and why focused context matters. Skip tool-specific details unless they help a comparison.
Practical references
These are not sit-and-read assignments. Keep them open while you set up Codex App and AGENTS.md, write the security review and governance worksheet, plan the comments feature, compare architecture docs and draft your playbook, or whenever you need a quick check.
OpenAI — Codex app review pane (opens in a new tab)
Keep open while you inspect diffs and decide what to keep, reject or comment on in Codex App.
Read this part Read what the review pane shows and how it helps you understand changes, give targeted feedback and decide what to keep.
OpenAI — Codex app settings (opens in a new tab)
For configuring the Codex App environment, editor and file behavior, and local workflow preferences.
Read this part Use only the settings that help you finish the module safely. Don’t spend time tuning the app before the docs-first deliverables are done.
AGENTS.md — Open format guide (opens in a new tab)
Examples of what belongs in an agent-facing project guidance file: overview, setup commands, testing commands, code style and security considerations.
Read this part Copy the structure, not the content. Your AGENTS.md should reflect the Task Tracker stack and the module’s boundaries: read first, docs first, reject unexpected app/ edits.
OWASP — Top Ten Web Application Security Risks (opens in a new tab)
Use while you grade Codex’s security findings and write the top-3 backlog.
Read this part Focus on the categories likely in a small web app: broken access control, injection, insecure design, security misconfiguration, vulnerable or outdated components, and logging and monitoring gaps.
GitHub Docs — Responsible use of GitHub Copilot code review (opens in a new tab)
A cross-tool reminder that AI review supplements human review rather than replacing it.
Read this part Read the capabilities, limitations, false positives, missed issues and how to improve review quality. Skip product setup.
GitHub Docs — Best practices for using GitHub Copilot (opens in a new tab)
Transferable context habits: give helpful context, keep the relevant files visible, and start a new conversation when the context stops helping.
Read this part Read the context-management advice. Skip the Copilot-specific setup unless you use Copilot outside this course.
Optional deeper dives
Useful, and deliberately not required for the quiz or the deliverables. Use them only after the core readings and practical references.
Anthropic Engineering — Effective context engineering for AI agents (opens in a new tab)
A broader agent-engineering explanation of why context quality shapes agent behavior.
Read this part Read the introduction and the definition of context engineering. Skip the advanced orchestration details unless you build agent systems yourself.
LangChain — Context Engineering for Agents (opens in a new tab)
A compact vocabulary for context strategies beyond this module.
Read this part Focus on the write, select, compress and isolate categories, and map them back to strategies A, B and C rather than treating them as new required terms.
NIST — AI RMF Playbook (opens in a new tab)
For connecting your personal governance rules to a broader risk-management framework.
Read this part Skim the Govern, Map, Measure and Manage framing. Don’t try to apply the whole framework to the Task Tracker.
NIST — Generative AI Profile for the AI RMF (opens in a new tab)
Shows how a formal risk framework is extended for generative AI systems.
Read this part Read selectively for governance language about generative AI risk. Skip the detailed crosswalks and enterprise controls unless you need them at work.
Research papers on AI-generated code security (opens in a new tab)
Companion: Frontiers in Big Data — SLR on AI models and code-generation security (opens in a new tab)
Companion: arXiv — Security Weaknesses of Copilot-Generated Code in GitHub Projects (opens in a new tab)
For instructors or advanced students who want the evidence behind the claim that AI-generated code still needs a security review. The main link is the arXiv paper “Security Vulnerabilities in AI-Generated Code: A Large-Scale Analysis.”
Read this part The suggested order: skim the large-scale GitHub analysis abstract, then the systematic literature review, then the empirical study of Copilot-generated code if you want more depth.
Where each one helps
Readings, mapped to the lessons.
| Reading | Supports |
|---|---|
| Core 1 · Codex app; Practical 1 · review pane; Practical 2 · settings | Lesson 2, Codex App and AGENTS.md |
| Core 2 · AGENTS.md custom instructions; Practical 3 · AGENTS.md open format | Lesson 2, writing a repo-grounded AGENTS.md |
| Core 3 · OpenSSF guide | Lessons 3 and 4, security posture and your AI usage rules |
| Core 4 · OWASP Secure Code Review; Practical 4 · OWASP Top Ten | Lesson 3, the manual scan, grading and the top-3 backlog |
| Practical 5 · Copilot code review, responsible use | Lessons 3 and 7, AI review as a supplement to human review |
| Optional 5 · research on AI-generated code security | Lesson 3, why AI code still needs a security review |
| Optional 3 and 4 · NIST AI RMF Playbook and Generative AI Profile | Lesson 4, governance language beyond the course |
| Core 5 · Context engineering for coding agents; Practical 6 · Copilot best practices | Lesson 6, choosing a context strategy |
| Optional 1 and 2 · Anthropic and LangChain on context engineering | Lesson 6, vocabulary for strategies A, B and C |
Read with careThe PDF ties each reading to an activity in its own wording; this table restates those ties against the lessons here.