Design Principles · Course resources

Every source and tool the slides name

The decks carry no reading list. This guide gathers what they do name: the sources credited on slides, the editing and testing tools they mention, and the slide each one comes from.

Before you click

A link appears only where the deck itself carries one; everything else is named as the slide names it, so search for it by name. Links open in a new tab and have not been assessed here.

Week 1

Week 1 · Fundamentals of Imagery

Open the week
  1. Nielsen Norman Group, “Design Thinking 101”

    The six-stage design thinking diagram (empathize, define, ideate, prototype, test, implement) is credited on the slide to NNgroup.com.

    Where Deck W1 L1, slide 7

  2. Adobe Photoshop

    Named as the example tool for the photo-editing practical activity; the image-size and hue/saturation dialogs on the slides are of this kind.

    Where Deck W1 L4, slides 3-5

  3. Getty Images

    Paid stock library: extensive, high-quality, editorial content, but expensive with complex licensing.

    Where Deck W1 L5, slide 5

  4. Shutterstock

    Paid stock library: huge, high-quality, varied collection, but costly with some exclusive images.

    Where Deck W1 L5, slide 5

  5. Pexels

    Free photo library, shown with Unsplash: free, high-quality and easy, but limited size variations and less unique.

    Where Deck W1 L5, slide 5

  6. Unsplash

    Free photo library, shown with Pexels and given the same pros and cons.

    Where Deck W1 L5, slide 5

  7. Freepik

    Free and premium vector graphics; the deck notes attribution is required for free use.

    Where Deck W1 L5, slide 5

  8. Flaticon

    Large icon library in various formats; the deck notes attribution is required for free use.

    Where Deck W1 L5, slide 5

  9. Creative Commons

    Named as one of four license types: public licenses with varying conditions.

    Where Deck W1 L5, slide 6

Week 2

Week 2 · Typography

Open the week
  1. Fredoka on Google Fonts — Milena Brandão (opens in a new tab)

    The rounded typeface the deck chooses for a children’s birthday invitation; the slide links its designer credit.

    Where Deck W2 L2, slide 7

  2. Fredoka on Google Fonts — Hafontia (opens in a new tab)

    The second designer credit on the Fredoka slide, also linked.

    Where Deck W2 L2, slide 7

  3. Pangram Sans Rounded, by Pangram Pangram

    Credited for the “Smiley faces can be round as well” sample of a rounded sans.

    Where Deck W2 L2, slide 7

  4. Farahat Design

    Credited for the Arabic poster and its typeface, the deck’s type-family example.

    Where Deck W2 L2, slide 9

  5. designmantic.com

    Credited for the “fear” type-as-image picture on the Lesson 1 reflection slide.

    Where Deck W2 L1, slide 15

  6. suvoray.com

    Credited for the “I will find you” image showing one phrase in two moods.

    Where Deck W2 L2, slide 11

  7. speckyboy.com

    Credited for the “Using too many fonts is bad” image.

    Where Deck W2 L3, slide 8

  8. Mashq Conference website

    A conference on Arabic typography; its bilingual site opens the pairing lesson.

    Where Deck W2 L3, slide 2

  9. Rabie typeface specimen page (خط ربيع)

    An Arabic typeface’s web specimen with a type tester, shown on the pairing takeaways slide.

    Where Deck W2 L3, slide 7

  10. Medium

    An annotated Medium article screenshot illustrates heading, body and caption sizes in pixels.

    Where Deck W2 L4, slide 5

  11. WAVE

    Web accessibility evaluation tool named for testing.

    Where Deck W2 L4, slide 9

  12. axe

    Web accessibility testing tool named for testing.

    Where Deck W2 L4, slide 9

  13. ChromeVox

    Screen reader for Chrome, named among web testing tools.

    Where Deck W2 L4, slide 9

  14. VoiceOver (iOS)

    Apple’s built-in screen reader, named for mobile testing.

    Where Deck W2 L4, slide 9

  15. TalkBack (Android)

    Android’s built-in screen reader, named for mobile testing.

    Where Deck W2 L4, slide 9

  16. Accessibility Scanner

    Android app that suggests accessibility fixes, named for mobile testing.

    Where Deck W2 L4, slide 9

  17. Ibnulyemen

    Credited (© 2018) for the chart of Arabic diacritical marks.

    Where Deck W2 L5, slide 7

  18. Jozoor

    Credited (© 2014 Jozoor Team) for Arabic lettering shown as a creative use of characters.

    Where Deck W2 L5, slide 7

  19. Typefaces named as examples

    Times New Roman, Georgia, Garamond, Baskerville, Arial, Helvetica, Verdana, Futura, Lobster, Pacifico, Brush Script, Impact, Jazz LET, Stencil, Jokerman, Papyrus, Curlz MT, Comic Sans, Kristen ITC, Bradley Hand, Courier, Courier New, Monaco, Consolas, Gilroy, Reem Kufi, Playfair Display and Montserrat.

    Where Deck W2 L1, slides 7-9 · Deck W2 L2, slides 2-6 · Deck W2 L3, slide 4

  20. Brand and website examples

    Burberry and Spotify (typography in UX), an Arabic news site from MTV Lebanon (Naskh for news), and Jacquemus, Nike By You, Harley-Davidson and the Aïshti Foundation (the rule of three).

    Where Deck W2 L1, slide 13 · Deck W2 L2, slide 8 · Deck W2 L3, slide 5

Week 4

Week 4 · Space and Grids

Open the week
  1. My Modern Met: negative space definition (opens in a new tab)

    The online art and design magazine the deck credits as the source of its Rubin’s vase images; the slide links to its article on negative space.

    Where Deck W4 L3, slide 12

  2. Rubin’s vase

    The classic figure-ground image, shown in three colorings as the deck’s reflection exercise.

    Where Deck W4 L3, slide 12

  3. Sunday in Scotland home page

    A chocolate retailer’s website shown as the deck’s example of positive space in UI design: one headline and two buttons over a full-width photo.

    Where Deck W4 L3, slide 6

  4. Moon poster before-and-after

    An uncredited night photograph with the line “To The moon & never Back,” set twice to show negative space used badly and well.

    Where Deck W4 L3, slide 4

  5. Contact page example

    An uncredited contact-page design the deck calls positive and negative space “balanced perfectly.” Its contact details are not reproduced.

    Where Deck W4 L3, slide 8

  6. Furniture store landing page

    An uncredited landing-page design shown with a twelve-column grid overlay as the deck’s example of a grid in UI design.

    Where Deck W4 L5, slide 4

  7. Restaurant home page

    An uncredited food website shown with a column grid overlay to illustrate the column grid.

    Where Deck W4 L5, slide 6

  8. User review card and checkout dialogs

    Uncredited interface mock-ups shown with and without a grid to illustrate the benefits of grids.

    Where Deck W4 L5, slide 8

  9. Responsive grid illustration

    An uncredited diagram of column grids at several panel sizes.

    Where Deck W4 L5, slide 11

  10. American University of Beirut, Maroun Semaan Faculty of Engineering & Architecture

    The institution whose module-video decks this week is built from, produced with the Abdulla Al Ghurair Hub for Digital Teaching and Learning.

    Where Deck W4 L3, slides 1 and 13 · Deck W4 L5, slides 1 and 17

Back to the course